My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
7/7/1982
CBCC
>
Meetings
>
1980's
>
1982
>
7/7/1982
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/23/2015 11:49:39 AM
Creation date
6/11/2015 2:08:09 PM
Metadata
Fields
Template:
Meetings
Meeting Type
Regular Meeting
Document Type
Minutes
Meeting Date
07/07/1982
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
232
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ON MOTION by Commissioner Bird, SECONDED <br />by Commissioner Lyons, the Board unani- <br />mously authorized an expenditure of up to <br />$500.00 for equipment needed to chlorinate <br />the water at Blue Cypress Lake Park and a <br />transfer to account #102-210-572-66.39 for <br />funding for this purpose. <br />APPROVAL OF AGREEMENT FOR DESIGN OF FOURTH COURTROOM <br />John Calmes, Architect, was present, and Attorney <br />Brandenburg explained the proposed procedure in which Mr. <br />Calmes would interview those who would be using this <br />courtroom and would then submit a plan, alternates, and a <br />tentative budget, after which the Commission would instruct <br />him as to what type of courtroom they would like designed. <br />Commissioner Bird suggested that instead of conducting <br />individual interviews, that potential user groups be brought <br />together and the use of this room discussed at that time. <br />Attorney Brandenburg agreed that the Commission could <br />invite all these potential users to be present when Mr. <br />Calmes presented his plan. He noted that the proposed <br />contract is the standard AIA contract with modifications. <br />Commissioner Fletcher complimented Attorney Brandenburg <br />on the modifications and inquired whether we have to address <br />both Phase I.and Phase II of the project today. <br />Attorney Brandenburg noted that the contract covers <br />both. He did not believe Mr. Calmes can give us a total <br />estimate at this time for the reason that parts of his <br />proposed program may possibly be found controversial and <br />require some rework; he, therefore, cannot estimate the <br />total time that may be involved. The Attorney noted that <br />the hourly rate proposed is commensurate with that usually <br />charged in this area. <br />J U L 71982 49 �oK 50 PAA 219 <br />
The URL can be used to link to this page
Your browser does not support the video tag.