My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
7/14/1982 (2)
CBCC
>
Meetings
>
1980's
>
1982
>
7/14/1982 (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/23/2015 11:49:39 AM
Creation date
6/11/2015 2:13:05 PM
Metadata
Fields
Template:
Meetings
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
27
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
3: Project #82-R-17 Plant Rebuild (1) <br />This project heading includes all trunk and feeder cables <br />planned for replacement within our fiscal year 11198211. <br />For purposes of clarity this project is divided'into two <br />categories: Trunk and Feeder. <br />Both trunk and feeder rebuild projects are noted by 482-R-17 <br />(1). Areas of trunk and feeder rebuild are listed below <br />by location with affected cable areas noted: <br />1. Trunk -- Sebastian tower to Amp #1 <br />This portion of project #82-R-17 (1) calls for the <br />replacement of our main trunk line from the tower site to <br />our first trunk amplifier in line. This replacement will <br />reduce the system noise levels on all system areas. Planned <br />completion date is. March 1982. <br />2. Winter Beach to Gifford (northern limits) <br />This replacement span will increase system reliability <br />into the south end of existing plant. The rebuild of this <br />area is due to numerous splices in this particular span <br />which has caused fluctuating signal levels into the <br />southern limits of our system. Completion is planned for <br />March 1982. <br />3. Roseland - Gibson Street to Havenview Drive <br />This span is to be replaced primarily to up -grade the <br />quality of cable presently in the plant. The cable being <br />used for all rebuilding projects uses a flooding compound <br />more resistant to moisture penetration. Completion date <br />will be May 1982. <br />4. Roseland - Bay Street to Gibson Street <br />This span_' is to be replaced to improve technical <br />specification within the Roseland system design. The <br />,improved signal loss characteristics of the new cable will <br />bring this specific area of plant within design spec- <br />ifications. Project completion date is May 1982. <br />5. Wabasso - Church Street to Water Tower <br />This span will be replaced due to numerous existing <br />splices and evidence of moisture permeation. This portion <br />of project #$2-R-17 (1) is primarily preventative in <br />nature as these existing splices will and are causing <br />system response problems. Completion of this project will <br />be June 1982. All cabled areas south of the Wabasso <br />Elementary School will be affected by this replacement span. <br />6. Wabasso - Old U.S. 1 at the water tower to 55th Avenue <br />The replacement of this span will bring system signal <br />levels within design specifications and allow for future <br />system expansion along both King's Highway and Lateral "A" <br />off West Wabasso Road (s-510). All cabled areas west of <br />U.S. 1 on West Wabasso Road will be directly affected by <br />this portion of our rebuild. Project completion will be <br />June 1982. 4, <br />JUL 14 1982 11 oo� 50 FACE5210- <br />
The URL can be used to link to this page
Your browser does not support the video tag.