My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
7/14/1982 (2)
CBCC
>
Meetings
>
1980's
>
1982
>
7/14/1982 (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/23/2015 11:49:39 AM
Creation date
6/11/2015 2:13:05 PM
Metadata
Fields
Template:
Meetings
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
27
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
J U L 141992 09.OK 50 519 <br />j . <br />Following are the specific areas addressed by this <br />project including expected completion dates: <br />�': Roseland Road- An additional power supply directly <br />affecting the system areas south of Roseland Road from <br />Josie Street out Roseland Road to the end of existing <br />plant at "Rivers Edge". Expected completion date of <br />this part of project #82-R-05 was planned for March 1, <br />1982, however the immediated need for this power <br />supply forced completion before the expected date. <br />Rewire and tie-in of this supply was completed January <br />7, 1982. <br />West Wabasso Road - This power supply affects all <br />cabled areas from Old U.S. 1 west on West Wabasso Road. <br />Scheduled completion date is April 1982. <br />3A: North Gifford Road - This power supply affects all <br />cabled areas west on North Giffor.d Road from Old U.S. 11 <br />therefore directly benefitting all subscribers within <br />the Gifford area. <br />Schumann Drive - While this power supply will be <br />located within the incorporated area of the "City of <br />Sebastian" the addition of this power supply is in <br />the first 3 spans from our tower site therefore <br />affecting over-all system reliability from Gifford <br />(south -end) to Micco (north end). <br />Project #82-H-10 Channel #9 Antennae <br />This project is for the replacement of the Channel #9 <br />antennae (WFTV) currently in use in our Sebastian <br />tower. The purpose of replacement is to up -grade <br />the system reception on this channel. The re- <br />placement of this antennae will be completed upon <br />delivery expected to be in March 1982. <br />Project #82-H-13 Processor Rework <br />The purpose of this project is to up -grade our <br />channel processor existing at our Sebastian tower <br />improving reception reliability on channel #5 (WPTV) <br />our NBC Channel. The rework of this processor in <br />combination with the following project #82=H-15 will <br />reduce system level noise on both channels 5 WPTV <br />and 11 WTOG while also providing video carrier levels <br />necessary on these channels to control system signal <br />levels through up -graded system electronics, i.e. <br />Sylvania Amplifiers. Simply speaking these processors <br />will assist in controlling level and scope control <br />over system signal levels, presently uncontrollable <br />on a 24hr a day basis. <br />Project #82-H-15 11 Processor <br />This processor will be replacing an outdated Anaconda <br />model processor with a state of the art piece of <br />equipment. Additionaly providing a video carrier for <br />the control of system level as previously mentioned <br />in project'#82-H-13. <br />10 <br />
The URL can be used to link to this page
Your browser does not support the video tag.