My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
7/14/1982 (2)
CBCC
>
Meetings
>
1980's
>
1982
>
7/14/1982 (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/23/2015 11:49:39 AM
Creation date
6/11/2015 2:13:05 PM
Metadata
Fields
Template:
Meetings
Meeting Type
Special Call Meeting
Document Type
Minutes
Meeting Date
07/14/1982
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
27
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
J <br />3: <br />Trunk <br />Cables controlling or affecting system signal flow - <br />affects reception on an over-all system level regardless <br />of its specific position or signal direction within <br />existing plant. <br />4: Feeder <br />Cables controlling or affecting system reception on a <br />more specific area basis - these are cables directly <br />linking subscribers with our system. <br />ENGINEERING GOALS & OBJECTIVES FOR 1982 BY CATEGORY & PROJECT NUMBER <br />1: Repair Equipment: <br />A. Project #82-T-07 Cable Locators <br />Three additonal cable locators will be purchased for <br />use in tracing and isolating system faults. The addition <br />of these locators will assist our technical staff in <br />responding and repair of system problems on a more timely <br />basis. Thus allowing the most affective utilization of <br />field personnel. Projected delivery of this equipment will <br />begin March 1, 1982 with the third unit arriving July 1, 1982. <br />B. Project #82-X-06 Vibrator Plow <br />This equipment will allow the replacement of drop cables <br />for subscribers at a depth more likely to prevent subscriber <br />cuts than when these same cables are buried by hand. -The <br />time required to bury drops by hand will be drastically <br />reduced allowing concentration on the addition of new <br />subscribers to the system while also playing an important <br />role in preventative measures safeguarding continued <br />customer satisfaction. <br />C. Project 482-M-02 Plant Maps <br />The re -draw of system maps incorporating a system grid <br />of our entire system will assist our field staff in the <br />location and repair of the existing system. Time wasted <br />in attempts to isolate faults in unfamiliar areas of plant <br />will be eliminated, obviously improving response time to <br />subscriber problems. <br />2: System Electronics: <br />A. Project #82-R-05 Power Realignment <br />The purpose of this project is to provide additional <br />voltage to existing plant in areas where plant extensions <br />were made without allowing for powering of the electronics <br />added within the extensions prior to our acquisition of <br />the system. New build areas include all additional <br />powering necessary for additional electronics. <br />J U L 14 1982 <br />7 <br />1 <br />BOOK :v50 FACE 518 <br />
The URL can be used to link to this page
Your browser does not support the video tag.