Laserfiche WebLink
JUL 14 1992 <br />xnn incEICABLEWC <br />Page 1 <br />Boax 50 P,4UE 517 <br />P.O. Box 327 _ <br />Sebastian, Florida 32958 <br />305/589-3846 <br />1: What and when will action be taken to resolve the plant <br />associated problems? <br />There is now and will be ongoing maintenance programs <br />to resolve plant associated problems. There have been <br />great strides in our technical department since system <br />acquisition. Our engineering goals and objectives (as <br />described in question 2) supplies more information <br />concerning this issue. <br />General engineering objectives maintained at this <br />time include the over-all upgrade of system materials <br />used; utilizing state-of-the-art electronics and cable <br />more suited for our particular applications. The end <br />result being a cable system with more reliable and <br />functional plant, assuring lowered maintenance costs <br />and consumer satisfaction. <br />Our 111982" budgeting focusses specifically on <br />encountered plant difficulties and is addressed as our <br />number one priority throughout this fiscal year. <br />2: What are the engineering goals and objectives (by project) <br />for 1982?_ <br />As previously stated our primary objective reflected <br />in our 111982" fiscal budget is the over-all upgrading of <br />plant beginning at the head end, and ending in the sub- <br />scriber's home. The projects itemized below are listed by <br />the appropriate project number and anticipated completion <br />date. Each project or piece of equipment in its own con- <br />text will have a positive affect on the unincorporated <br />areas of Indian River County while obviously benefitting <br />other areas outside County jurisdiction. <br />Problem areas requiring immediate attention will hold <br />priority over other projects, therefore our projected <br />completion schedule is tentative in that areas of present <br />concern may drop in priority due to unforeseen problems <br />that may require more immediate action. <br />Engineering goals and objectives are categorized into <br />four (4) general project headings; System Electronics, <br />Trunk, Repair Equipment, and Feeder. <br />1: Repair Equipment <br />Any equipment necessary for timely plant repair and <br />Preventive maintenance programs. <br />2:• System Electronics <br />Any active or passive devices affecting general <br />reception and system integrity. For example: Additional <br />powering - amplifier upgrade - channel processing - antennae. <br />8 <br />