My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1985-52
CBCC
>
Ordinances
>
1980'S
>
1985
>
1985-52
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/20/2019 12:13:49 PM
Creation date
10/5/2015 9:56:16 AM
Metadata
Fields
Template:
Ordinances
Ordinance Number
1985-52
Adopted Date
06/05/1985
Ordinance Type
Wastewater Treatment Plants
State Filed Date
06\10\1985
Entity Name
Orchid Island
Subject
Wastewater Systems
Codified or Exempt
Codified
Supplemental fields
SmeadsoftID
13312
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
3
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
50,000 gallons per day or less utilizing contact stabilization mode <br />for treatment are prohibited. <br />(C) All wastewater treatment plants shall have surge <br />control equaling 20% of the design capacity of the plant. <br />SECTION 3. <br />FLOW MEASUREMENT <br />.All wastewater treatment plants located on Orchid Island <br />shall have a flow measuring device which will provide a record of <br />diurnal flow changes as well as total daily flows. <br />SECTION 9. <br />MONITORING REQUIREMENTS <br />All wastewater treatment plants located on Orchid Island <br />shall comply with the provisions of Florida Administrative Code <br />Chapter 17-19, but shall, as a mimimum, monitor for biochemical <br />oxygen demand and total suspended solids within the effluent <br />through analysis of no less than one representative grab sample of <br />the effluent per week. This monitoring requirement is a minimum <br />and applies to all wastewater treatment plants regardless of size. <br />Where additional or more stringent monitoring is required under the <br />Florida Administrative Code, Chapter 17-19, or by the Indian River <br />County Division of Utility Services or the Florida Department of <br />Environmental Regulation, the additional or more stringent <br />monitoring shall be performed. <br />SECTION 5. <br />TIME LIMITATIONS <br />Existing wastewater treatment plants located on Orchid <br />Island shall comply with Sections 2 through 5 of this ordinance <br />within the following described deadlines: <br />(A) Compliance with the effluent limits and design <br />capacity requirements shall be accomplished within 180 days from <br />the effective date of this ordinance. <br />(B) Compliance with the surge control and flow <br />measurement requirements shall be accomplished within 90 days from <br />the effective date of this ordinance. <br />(c) Compliance with the monitoring requirements shall be <br />accomplished within 60 days from the effective date of this <br />ordinance. <br />-2- <br />
The URL can be used to link to this page
Your browser does not support the video tag.