Laserfiche WebLink
M <br />prints at no additional cost to the County. Such drawings will be <br />based upon information provided by the Resident Project <br />Representative and contractors. <br />(10) The Engineer will provide notices and adver- <br />tisements of final payments if required by state statute. <br />(11) The Engineer will be available to furnish <br />engineering services and consultation necessary to correct all <br />P. *�,^ <br />unforeseen project ape=ting di ficulties for a period of one year <br />after the date of.final inspection and acceptance of the project <br />by the County as a part of basic services hereunder. This service <br />will include instruction of the County in initial project opera- <br />tion and maintenance but will not include supervision of normal <br />operation of the system. Such consultation and advice shall be <br />considered an additional service only in the event the unforeseen <br />difficulty is not due to design defect or oversight of engineer in <br />rendering services under this agreement, in which event, compensa- <br />tion shall be paid to the Engineer in accordance with Section C of <br />this agreement. <br />SECTION III - TIME FOR COMPLETION <br />A. Design Phase <br />The services to be rendered by the Engineer under the <br />design phase of the project shall be commenced upon written notice <br />from the Director of the Public Works Department subsequent to the. <br />execution of this agreement and subsequent to the study and report <br />phase and shall be completed within the time stated in the Notice <br />to Proceed. Reasonable extension of the contract time will be <br />granted in the event there is delay on the part of the County in <br />fulfilling its part of the agreement, or should weather conditions <br />or acts of God render performance of engineer's duties impos- <br />sible. <br />B. Construction Phase <br />The services to be rendered by the Engineer under the <br />construction phase of the project shall begin at the time of the <br />award of the contract for construction. The construction phase <br />shall be considered complete upon final acceptance by the County <br />of the construction. <br />A U G 18 1982 -11- BOK 51 PACE 43 <br />