My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
8/18/1982
CBCC
>
Meetings
>
1980's
>
1982
>
8/18/1982
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/23/2015 11:49:39 AM
Creation date
6/11/2015 2:20:01 PM
Metadata
Fields
Template:
Meetings
Meeting Type
Regular Meeting
Document Type
Minutes
Meeting Date
08/18/1982
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
110
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
the Engineer. <br />(a) Soil Survey <br />The County shall make direct payment to the approved <br />soil laboratory for soil survey work requested by.Engineer and <br />approved by County which is necessary in designing the project. <br />All required soil survey work for the project is estimated to cost <br />$4,000.00. <br />(b) Aerial Photography <br />The County shall make direct payment to the approved <br />firm for aerial photographs requested by the Engineer and approved <br />by the County as is necessary in designing the project. All <br />required aerial photography for the project is expected to cost <br />$5,000.00. <br />(c) Printing and Reproduction <br />The County shall make direct payment to the Engineer <br />for the cost of printing project plan sheets required for utility <br />coordination. The maximum cost allowed per print for sheets <br />utilized for this purpose shall be.eighty ($0.80) cents and the <br />total cost to the County for this reproduction service shall not <br />exceed $8,000.00. <br />SECTION V - ADDITIONAL WORK <br />In the event changes are requested by the County to the <br />contract plans after said plans have been approved and accepted by <br />the County and upon the issuance of a work order for said addi- <br />tional work by the Director of the Public Works Department, said <br />additional work may commence in accordance with the following fee <br />schedule: <br />(1) <br />Project Manager - <br />$40.00 per hour <br />(2) <br />Project Engineer - <br />$30.00 per hour <br />(3) <br />Designer - $22.50 <br />per hour <br />(4) <br />Draftsman - $17.50 <br />per hour <br />(5) <br />Typist - $15.00 per <br />hour <br />(6) <br />Expenses, prints, <br />etc. at actual cost to <br />Engineer. <br />, <br />Should the construction phase of this contract exceed <br />one year in duration, the Engineer shall be compensated in an <br />AUG L81992 -13- c . 51 ME 45. <br />
The URL can be used to link to this page
Your browser does not support the video tag.