Laserfiche WebLink
AUG 181982 sea 51 pm,E 6 \ <br />amount equal to the percentage of a year of the time overrun times <br />$10,000.00 for engineering supervision plus the percentage of a <br />year of the time overrun times $30,000.00 for full time on-siteer <br />0 <br />resident inspection. Additions to work will not increase fee for <br />resident inspection or engineering supervision if it does not <br />extend construction phase beyond one year. <br />SECTION VI - PARTIAL PAYMENTS <br />The County will make monthly partial payments to the <br />Engineer in accordance with the following schedule for all author- <br />ized work pertaining directly to this project performed during the <br />previous calendar month. <br />A. All Phases <br />(1) The Engineer shall submit duly certified <br />invoices in triplicate to the Director of the Public Works <br />Department. <br />(2) The amount of the invoices submitted shall be <br />the prorated amount due for all work performed to date under this <br />phase, determined by applying the percentage of the work completed <br />as certified by the Engineer to the total lump sum due for this <br />phase of the work. <br />(3) The amount of the partial payment due for the <br />work performed to date under these phases shall be an amount <br />calculated in accordance with Paragraph 2 above, less ten (10%) <br />percent of the amount thus determined which shall be withheld by <br />the County and less previous payments. <br />(4) The ten (10%) percent retainage withheld with <br />respect to the design phase shall be paid in full to the Engineer <br />upon award of a construction contract, but in no case shall the <br />amount be retained longer than four (4) months after the date of <br />final acceptance of the design phase by the Director of Public <br />Works. <br />(5) The ten (10%) percent retainage with respect to <br />the construction phase shall be paid in full to the Engineer upon <br />receipt of a Certificate of Completion and acceptance of the <br />construction by the County. <br />SECTION VII- EXTRA WORK <br />In the event extra work is necessary due to change in <br />scope of the project, such work shall be the subject of a <br />