My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
10/20/1982
CBCC
>
Meetings
>
1980's
>
1982
>
10/20/1982
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/23/2015 11:49:40 AM
Creation date
6/11/2015 2:34:44 PM
Metadata
Fields
Template:
Meetings
Meeting Type
Regular Meeting
Document Type
Minutes
Meeting Date
10/20/1982
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
124
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
M M M <br />requested by the City and asked if they are different than <br />in the original drawings. <br />Administrator Wright explained that they were not <br />included in the original drawings. It was not felt we <br />needed them, but the City wants them. <br />THE CHAIRMAN CALLED FOR THE QUESTION. <br />It was voted on and carried unanimously. <br />CONTRACT CHANGE ORDER FORM `•:t ► r" • <br />Contract No. Date October 8, 1982 - <br />Change -Order No. 8 Location Pebble Bay Sewerage Area <br />To: (Contractor) Bain Underground Utilities <br />You are hereby requested to comply with the following changes from the contract drawings cis specificaticn <br />Item Description of Changes - Quantities, Units, Unit Prices, <br />No. I (,hange in Completion Schedule, Etc. - <br />1 The Contractor is to install two (2) Furnace Class <br />948 Current Overload Relays in the Control Panel <br />for the Peb,ple Bay North Lift Station <br />Change in contract price due to this Change Order: <br />Total Decrease <br />Total Increase; <br />Difference between Col. (3) and (4): <br />Net (increase) (56&Ul dyK contract price <br />Decrease in - 'Increase in <br />Contract Price -Contract Pric <br />S z <br />`XXXXXXXXXXX <br />$400.00 <br />.$400.00 <br />XXXXXXXXXXX <br />S 400.00_ <br />S 400.00 _ <br />f400.00 <br />The sum of S 400.00 is hereby added to,'k(1t the total-, contract price, ar <br />the totai adjusted contract price to date thereby .is S 121, 618.35 <br />The time provided for completion in the contract is unchanged;- increasedi 4fc-reased,, y ;� -0- r <br />calendar days. This document shall Become an -amendment t* the mntiM. and all• prtrwisions <br />contract will apply hereto. <br />Accepted by. G w to L <br />��', oniradorI IDate <br />Recommended by: ` " �, .. •iJ l' -- % 6.7 z-77 �- <br />k nr;inecr Date- <br />xzqueaci -a3►• <br />v ___. <br />Ant <br />OT : Work °pec ' orris d :; d r ; cha ffl , vrd= qp6wt rvr► s ° is Vt}re S.ontramo <br />�AASL M3 <br />OCT 2 0 1982 slx 51 PAGE 751 <br />
The URL can be used to link to this page
Your browser does not support the video tag.