Laserfiche WebLink
r <br />OCT2 01982 <br />CHANGE ORDER #2 - SOUTf COUNTY 'CATER SYSTEM <br />90, 51 72 . <br />Engineer John Robbins reviewed the proposed Change <br />Order, noting that under the 2.7 million bond issue, there <br />was a line item for an 8" water line from 8th AVenue to Oslo <br />Road. It was expected to cost $128,000, but by issuing a <br />Change Order, they can take advantage'of the 1981 prices and <br />have the line installed now. FmHA has given approval for <br />the county to construct the line using the contractor on <br />site, and this would represent a savings of $22,000. <br />Administrator Wright noted that this will get water to <br />Ixora Utilities much quicker, and Engineer Robbins confirmed <br />that doing this now will be both -time saving anddollat <br />saving as explained in detail in his letter of October 15, <br />1982 to FmHA, which follows: <br />October 15, 1982 <br />Mr. Glenn Walden, State Director <br />Farmers Home Administration <br />P.O. Box 1088 <br />Gainesville, Florida 32602 <br />Subject: Water System Improvements <br />South County Water System <br />.Indian River County, Florida <br />Engineer's Project No. 6858, 6674 <br />Dear Glenn, <br />Sverv- -.-p & Parcel <br />and Associates, Inc. <br />1998 20th Streel <br />Vero Beach. Florida 32880 <br />308/882-2082 <br />Engineers <br />Architects <br />Planners <br />This letter is in response to our meeting of October the 7th, 1982 and <br />subsequent telephone conversation of Tuesday October 12, 1982 regarding <br />a Change Order to Contract Part I, Distribution System for the above <br />referenced project. <br />As you are aware, Scarborough Constructors is the contractor under Contract <br />Part I for the So4th County Water System. Indian River County is request- <br />ing a contract extension to Scarborough Constructors' contract to perform <br />three items as a contract change to the above referenced project. These <br />items that we discussed in our meeting of October the 7th are as follows: <br />1. An extension of the 20th Avenue. water line <br />2. Installation of a 12 inch gate valve at the city limits of Vero <br />Beach which interties the City and the County's water systems <br />3. Revision to the Mid -Florida tie-in which was a part of the <br />original contract for the South County water system <br />, <br />104 <br />