My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
11/17/1982
CBCC
>
Meetings
>
1980's
>
1982
>
11/17/1982
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/23/2015 11:49:40 AM
Creation date
6/11/2015 2:34:15 PM
Metadata
Fields
Template:
Meetings
Meeting Type
Regular Meeting
Document Type
Minutes
Meeting Date
11/17/1982
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
179
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
The Board reviewed the following memorandum from Art <br />Challacombe, Planning Department Manager: <br />TO: The Honorable Members DATE: November 15, 1982 FILE: <br />of the Board of County <br />Commissioners <br />DIVISION HEAD CONCURRENCE: <br />atrick Bruce King, AI <br />FROM: Art Challacombe <br />Planning Dept. Mgr. <br />SUBJECT: FLOODWATER PRO ECTIONEMENT ORDINAND <br />ANCE <br />REFERENCES: <br />It is requested that the data herein presented be given <br />--formal consideration by the Board of County Commissioners <br />at their regular meeting on November 17, 1982. <br />DESCRIPTIONS AND CONDITIONS: <br />Attached for your consideration is the proposed Stormwater <br />Management and Flood Protection Ordinance. This ordinance <br />will amend Ordinance 71-3, pertaining to stormwater runoff <br />control criteria; and Ordinance 78-25 pertaining to flood <br />protection requirements. <br />On November 10, 1982, the Planning and Zoning Commission <br />held a. public hearing on the proposed ordinance. Several <br />local engineers and architects participated in the discussion <br />relating to the ordinance. The majority of comments focused <br />on the technical aspects of stormwater management and flood <br />protection and were received by the Commission and County <br />staff. <br />The hearing concluded with a recommendation by the Planning <br />and Zoning Commission that the County Commission approve the <br />proposed ordinance. <br />. <br />On November 15, 1982, a mee ting was corrl ucbad , to allow County <br />: <br />staff and 'embers of the engineering/architectural community to <br />review and evaluate the proposed ordinance with•the revisions <br />discussed at the November 10, 1982, hearing. <br />ALTERNATIVES AND ANALYSIS: <br />Features of this Ordinarcr ate summarized as follows: <br />1) The Ordinance will combine requirements that are listed <br />in two existing ordinances. Many of the problems <br />associated with stormwater runoff and flooding can be <br />addressed under a comprehensive and single source; <br />2) Stormwater management and flood protection criteria <br />are incorporated with standards obtained from D.E.R., <br />St. Johns River Water Management District, Southwest <br />Florida Water Management District, and the.Federal <br />Emergency Management Agency. These standards reflect• <br />existing or proposed legislation in stormwater management <br />and flood riotetti.on; <br />NOV 17 19 39 K 732 FA. ;E P <br />
The URL can be used to link to this page
Your browser does not support the video tag.