My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2010-024
CBCC
>
Ordinances
>
2010's
>
2010
>
2010-024
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/18/2025 3:04:30 PM
Creation date
10/5/2015 9:07:11 AM
Metadata
Fields
Template:
Ordinances
Ordinance Number
2010-024
Adopted Date
11/02/2010
Agenda Item Number
10.A.1.
Ordinance Type
Comprehensive Plan Text Amendment
State Filed Date
11\09\2010
Subject
Capital Improvements Element 2030 Comprehensive Plan
Supplemental fields
SmeadsoftID
9011
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
102
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Comprehensive Plan Capital Improvements Element <br />As depicted in Table 6.18, demand can be measured quantitatively for each public facility category. <br />While the demand function for each facility consists of applying a rate to the number of facility users, <br />estimation of total demand is more complex. For concurrency management purposes, demand can be <br />divided into three types: existing, committed, and projected. Each must be considered separately for <br />purposes of concurrency management. <br />Existing Demand <br />Existing demand is simply the current level of use for a facility. For a roadway, it is the number of <br />peak hour/peak season/peak direction trips; for a school, it is the number of full-time enrolled <br />students; for water and wastewater treatment plants, it is the existing flow volume measured in <br />gallons per day. These figures are included within applicable plan elements. <br />Existing demand then reflects the use of a facility by the current population. When compared to <br />capacity, existing demand can show if the facility has unused capacity or if it is functioning over <br />capacity. <br />Existing demand, however, is not static. As population increases and dwelling units come on-line, <br />existing demand increases. These increases in existing demand can be identified through facility use <br />measurements. For example, regular traffic counts done on roads or treatment plant flow records are <br />examples of facility use measurements indicating existing demand levels. As existing demand levels <br />for facilities are updated, committed demand levels must be reduced if projects representing <br />committed demand have come on-line. <br />Committed Demand <br />Committed demand is a measure of the impact that approved development projects with reserved <br />capacity will have on facilities. When added to existing demand for a facility, the committed demand <br />for that facility will produce a more accurate estimate of unused capacity. This estimate of unused <br />capacity represents the amount of capacity that can realistically be allocated to new projects. <br />Committed demand must be determined by identifying all projects for which capacity has been <br />reserved through issuance of initial concurrency certificates which are still valid. Then the specific <br />facilities that will be impacted by these projects with reserved capacities must be determined; these <br />facilities will be roadways and the landfill, and they may be treatment plants, drainage conveyances, <br />and recreation facilities. Finally, the total demand on each facility attributable to committed demand <br />will be determined. <br />Applicable elements of the plan identify the rates to be applied to each project to determine facility <br />demand. Traffic volumes, for example, can be derived by applying a trip rate to the size of the <br />Community Development Department Indian River County <br />Supplement #_; Adopted November _, 2010, Ordinance 2010-_ <br />45 <br />
The URL can be used to link to this page
Your browser does not support the video tag.