My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2014-020
CBCC
>
Ordinances
>
2010's
>
2014
>
2014-020
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/18/2025 3:35:29 PM
Creation date
10/5/2015 1:12:29 PM
Metadata
Fields
Template:
Ordinances
Ordinance Number
2014-020
Adopted Date
12/02/2014
Agenda Item Number
10.A.1.
Ordinance Type
Comprehensive Plan
Subject
Capital Improvements Element Schedule Update
Supplemental fields
SmeadsoftID
13943
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
98
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Ordinance No. 2014-020 <br />Comprehensive Plan Capital Improvements Element <br />Existing demand, however, is not static. As population increases and dwelling units come on-line, <br />existing demand increases. Those increases in existing demand can be identified through facility use <br />measurements. For example, regular traffic counts done on roads or treatment plant flow records are <br />examples of facility use measurements indicating existing demand levels. As existing demand levels <br />for facilities are updated, committed demand levels must be reduced if projects representing <br />committed demand have come on-line. <br />Committed Demand <br />Committed demand is a measure of the impact that approved development projects with reserved <br />capacity will have on facilities. When added to existing demand for a facility, the committed demand <br />for that facility will produce a more accurate estimate of unused capacity. That estimate of unused <br />capacity represents the amount of capacity that can realistically be allocated to new projects. <br />Committed demand must be determined by identifying all projects for which capacity has been <br />reserved through issuance of initial concurrency certificates which are still valid. Then the specific <br />facilities that will be impacted by those projects with reserved capacities must be determined; those <br />facilities will be roadways and the landfill, and they may be treatment plants, drainage conveyances, <br />and recreation facilities. Finally, the total demand on each facility attributable to committed demand <br />will be determined. <br />Applicable elements of the plan identify the rates to be applied to each project to determine facility <br />demand. Traffic volumes, for example, can be derived by applying a trip rate to the size of the <br />project. Sanitary sewer and potable water both have rates of 250 gallons per day per equivalent <br />residential unit. Other public facility rates are discussed fully in their applicable Comprehensive Plan <br />Element. <br />Like existing demand, committed demand must be determined on a facility by facility basis. For <br />example, both existing demand and committed demand must be determined for each major roadway, <br />each school, each treatment plant, each major drainage conveyance, and the active cell in the landfill. <br />Also, like existing demand, committed demand estimates must be modified as projects are completed; <br />committed demand estimates must also be modified as new development orders are approved and old <br />development orders are terminated. <br />Proiected Demand <br />The third type of demand is projected demand. This consists of two types. One is non- <br />committed/non-reserved, single-family lot demand for all subdivisions platted after February 13, <br />1990, while the other is new project demand. <br />Community Development Department Indian River County <br />Adopted , 2014, Ordinance 2014- <br />44 <br />
The URL can be used to link to this page
Your browser does not support the video tag.