My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1/5/1983
CBCC
>
Meetings
>
1980's
>
1983
>
1/5/1983
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/23/2015 11:49:59 AM
Creation date
6/11/2015 2:43:59 PM
Metadata
Fields
Template:
Meetings
Meeting Type
Regular Meeting
Document Type
Minutes
Meeting Date
01/05/1983
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
94
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ALTERNATIVES AND ANALYSIS <br />The County staff has forwarded a copy of the preliminary program to the various <br />Circuit and County Judges, those individuals active in the local judicial process, <br />and the County's Criminal Justice Consultants, thereby requesting any technical <br />comments that may be appropriate along with any priority that may be assigned <br />to the program elements. Comments have been received by most individuals <br />contacted. Most comments pertain to minor items with the -exception of the <br />following: <br />1) Additional off-street parking in the area should be considered as <br />mentioned briefly at the end of the program. <br />2) It does not appear that a Deposition Room is necessary and the proposed <br />Witness Room/ Deposition Room can be designed as primarily a Witness <br />Room. <br />3) The proposed Holding cell could be a low priority and the existing <br />holding cell in the Courthouse could be used. <br />4) It has been a concensus that the existing walkway between the Courthouse <br />and the Annex be covered to some extent. Various alternatives should <br />be considered. <br />The general opinion is that the Architect's preliminary program appears adequate <br />after consideration of the comments presented by the judicial persons and other <br />individuals contacted. The Architect has estimated that cost for the total <br />project to be $325,000. This cost does not include additional parking. At <br />this time, the Architect is requesting the County to approve the preliminary <br />architectural program and accept the $325,000 budget. <br />RECOMMMATION AND FUNDING <br />It is recommended that <br />1) the Preliminary Architectural Program and preliminary Project budget <br />be approved subject to consideration of the attached comments by the <br />Judges, other local persons involved in the judicial process, and the <br />County's Correctional and Judicial system consultants. <br />2) the Architect be authorized to begin Schematic Design of the Fourth <br />Courtroom. <br />3) Funding for architectural services be authorized from Account No. 301- <br />131-519-66.51 (Courthouse Construction unencumbered balance $50,000) <br />in the amount of not -to -exceed $6000 for the Schematic Design Phase. <br />Board members indicated that they felt Mr. Calmes has <br />done an excellent job in his analysis, but expressed concern <br />about a budget of $325,000. <br />Architect John Calmes informed the Board that he had <br />tried to be very conservative in his "guesstimate" budget, <br />which includes $186,000 for construction of the 4th <br />Courtroom; $52,000 for construction of a cover for the <br />walkway; $12,000 for recording and amplification equipment; <br />and $75,000 for furnishings. He noted that these figures <br />were based on middle/high quality furnishings, and the <br />$186,000 for renovation for the 4th courtroom was estimated <br />on the basis of $100+ per foot. <br />M <br />Mr. Calmes continued that <br />I <br />
The URL can be used to link to this page
Your browser does not support the video tag.