My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2013-019
CBCC
>
Ordinances
>
2010's
>
2013
>
2013-019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/28/2019 12:42:09 PM
Creation date
10/5/2015 9:34:10 AM
Metadata
Fields
Template:
Ordinances
Ordinance Number
2013-019
Adopted Date
11/19/2013
Agenda Item Number
10.A.1.
Ordinance Type
Capital Improvements Element
Entity Name
CIP
Subject
Capital Improvements Program 5 Year Update
Supplemental fields
SmeadsoftID
12617
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
95
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Comprehensive Plan Capital Improvements Element <br />any development project where the impacts of such a project would lower the existing level -of -service <br />on any facility below that facility's adopted minimum level -of -service standard. <br />Policy 3.2: The county shall approve development only in accordance with the utility connection <br />matrix identified in the Sanitary Sewer and Potable Water Sub -Elements. <br />Policy 3_3: The county shall, concurrent with the impact of new development, provide the <br />infrastructure necessary to maintain the levels -of -service identified in the various elements of the <br />Comprehensive Plan. Where development is proposed and is consistent with all applicable <br />regulations but one or more public facilities is/are operating at an inadequate service level, the <br />applicant may at his expense make facility improvements to increase facility capacity when such <br />improvements are consistent with county plans and receive county approval. <br />Policy 3_4: The county shall make land use decisions based on the planned availability of facilities to <br />maintain adopted level -of -service standards. <br />Policy 3.5: The county hereby adopts Concurrency Management level -of -service standards for public <br />facilities that are established in the other Comprehensive Plan Elements and which are stated below: <br />➢ Stormwater Management: <br />The county hereby adopts the following level -of -service standard for all new drainage systems within <br />the unincorporated county: <br />➢ New development requiring major site plan approval or subdivision platting shall <br />construct a complete drainage system to mitigate the impacts of a 25 year/24 hour <br />design rainfall event using the soil conservation service type 2 modified rainfall <br />curves. <br />➢ Post development runoff for any drainage basin shall not exceed pre -development <br />runoff unless a maximum discharge rate has been adopted and the discharge does not <br />exceed that rate. If a maximum discharge rate has not been adopted for a basin, post <br />development discharge may not exceed pre -development discharge. <br />By 2015, all existing roadways in the county shall be improved to meet the following level -of -service <br />standards: <br />➢ Minimum road crown elevation for existing roads shall be raised during <br />resurfacing/rebuilding to the flood elevation resulting from the 2 year/24 hour storm <br />event on local streets. <br />➢ The center two lanes of rebuilt roads must be at or above flood levels resulting from a <br />10 year 24 hour storm event on Arterial and Collector roads. <br />Community Development Department <br />Adopted , 2013, Ordinance 2013 - <br />Indian River County <br />53 <br />
The URL can be used to link to this page
Your browser does not support the video tag.