My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2012-036
CBCC
>
Ordinances
>
2010's
>
2012
>
2012-036
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/18/2025 3:21:41 PM
Creation date
10/5/2015 9:16:01 AM
Metadata
Fields
Template:
Ordinances
Ordinance Number
2012-036
Adopted Date
11/06/2012
Agenda Item Number
10.A.1.
Ordinance Type
Land Development Regulations
State Filed Date
11\14\2012
Entity Name
Stormwater Management and Flood Protection
Code Number
Chapter 930 and Chapter 401 Amendmnts
Subject
Flood Maps New Flood Regulations
Codified or Exempt
Codified
Supplemental fields
SmeadsoftID
11548
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
78
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ORDINANCE 2012-036 <br />Section 930.14. Violations and Notice. <br />(1) Violations. Any development that is not within the scope of the Florida Building <br />Code but that is regulated by the floodplain regulations in this chapter that is performed without <br />an issued permit, that is in conflict with an issued permit, or that does not fully comply with <br />these regulations, shall be deemed a violation of these regulations. A building or structure <br />without the documentation of elevation of the lowest floor, other required design certifications, <br />or other evidence of compliance required by these floodplain regulations or the Florida Building <br />Code is presumed to be a violation until such time as that documentation is provided. <br />(2) Authority. For development that is not within the scope of the Florida Building <br />Code but that is regulated by the floodplain regulations in this chapter and that is determined to <br />be a violation, the Floodplain Administrator is authorized to serve notices of violation or stop <br />work orders to owners of the prODertv involved, to the owner's anent, or to the person or persons <br />erforming the work. <br />(3) Unlawful continuance. AU person who shall continue any work after having <br />served with a notice of violation or a stop work order, except such work as that person is directed <br />to perform to remove or remedy a violation or unsafe condition, shall be subject to penalties as <br />prescribed by law. <br />(4) Notice. In the event the community development director determines a violation <br />exists, a written notice of violation shall be issued to the owner of the property. The notice shall <br />contain: <br />(a) The name and address of the owner; <br />(b) The street address when available or a description of the building or land upon <br />which the violation is occurring; <br />Underline: Additions to Ordinance <br />S#ike-tla=eughi Deleted Text from Existing Ordinance <br />71 <br />C:\Documents and Settings\tlister\Desktop\Revised IRC Flood Protect Ord final 10-26-12.rtf <br />f «», shall be «o er-ded <br />dere -ipt of of the aff <br />i the a x... <br />n4ublie « 0 eras and .,,+.,ehe ., to lega <br />rated pfepei4y.- <br />Section 930.14. Violations and Notice. <br />(1) Violations. Any development that is not within the scope of the Florida Building <br />Code but that is regulated by the floodplain regulations in this chapter that is performed without <br />an issued permit, that is in conflict with an issued permit, or that does not fully comply with <br />these regulations, shall be deemed a violation of these regulations. A building or structure <br />without the documentation of elevation of the lowest floor, other required design certifications, <br />or other evidence of compliance required by these floodplain regulations or the Florida Building <br />Code is presumed to be a violation until such time as that documentation is provided. <br />(2) Authority. For development that is not within the scope of the Florida Building <br />Code but that is regulated by the floodplain regulations in this chapter and that is determined to <br />be a violation, the Floodplain Administrator is authorized to serve notices of violation or stop <br />work orders to owners of the prODertv involved, to the owner's anent, or to the person or persons <br />erforming the work. <br />(3) Unlawful continuance. AU person who shall continue any work after having <br />served with a notice of violation or a stop work order, except such work as that person is directed <br />to perform to remove or remedy a violation or unsafe condition, shall be subject to penalties as <br />prescribed by law. <br />(4) Notice. In the event the community development director determines a violation <br />exists, a written notice of violation shall be issued to the owner of the property. The notice shall <br />contain: <br />(a) The name and address of the owner; <br />(b) The street address when available or a description of the building or land upon <br />which the violation is occurring; <br />Underline: Additions to Ordinance <br />S#ike-tla=eughi Deleted Text from Existing Ordinance <br />71 <br />C:\Documents and Settings\tlister\Desktop\Revised IRC Flood Protect Ord final 10-26-12.rtf <br />
The URL can be used to link to this page
Your browser does not support the video tag.