My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2/16/1983
CBCC
>
Meetings
>
1980's
>
1983
>
2/16/1983
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/23/2015 11:50:00 AM
Creation date
6/11/2015 2:53:35 PM
Metadata
Fields
Template:
Meetings
Meeting Type
Regular Meeting
Document Type
Minutes
Meeting Date
02/16/1983
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
87
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
r o � <br />it back to the Board for formal adoption. As these programs <br />continue to expand, he believed it might be advisable at <br />some future date to consider whether we can give the Parks <br />Department authority to set some fees without having to come <br />back to the Board. <br />Commissioner Scurlock stated that he supports user fees <br />with some subsidization, but he felt that budget time would <br />be the appropriate time to set fee schedules. <br />ON MOTION by Commissioner Scurlock, SECONDED <br />by Commissioner Wodtke, the Board unanimously <br />authorized staff to -make the necessary analysis <br />of fees for certain recreation programs and <br />report back. <br />DISCUSSION RE BICYCLE PATHS <br />Chairman Bird reported that a meeting of the Bicycle <br />Path Committee was held.to address the request of Attorney <br />George Collins in regard to constructing a bicycle pedes- <br />trian path from the southern edge of The Moorings to the <br />17th St. Bridge causeway because it is too dangerous for <br />anyone to ride bicycles in the traffic on SR AlA. Mr. <br />Collins is proposing that the residents of that south county <br />area would pay for this improvement, which would be partly <br />in the County and partly in the City, by assessment or some <br />other equitable arrangement. The Chairman continued that <br />the committee liked the concept;• we do have adequate <br />right-of-way there; and the Bicycle Path Committee would <br />like the cooperation of the County Commission to authorize <br />Public Works Director Davis and the engineering staff to do <br />some preliminary design and cost estimating. In the mean- <br />time, Attorney Collins will be working with the property <br />owner groups and residents on a formula to pay for these <br />improvements. <br />57 <br />FES 16 1983 <br />
The URL can be used to link to this page
Your browser does not support the video tag.