My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2012-019
CBCC
>
Ordinances
>
2010's
>
2012
>
2012-019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/11/2021 1:34:56 PM
Creation date
10/5/2015 9:15:10 AM
Metadata
Fields
Template:
Ordinances
Ordinance Number
2012-019
Adopted Date
07/10/2012
Agenda Item Number
4.A.
Ordinance Type
Impact Fees
State Filed Date
07\18\2012
Entity Name
Transportation Monitoring
Code Number
Chapters 952 and 910
Subject
Traffic Impact Fees
Codified or Exempt
Codified
Supplemental fields
SmeadsoftID
11339
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
28
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ORDINANCE 2012-019 <br />(db) Large proiect (100 daily trips or <br />greater). <br />A traffic impact analysis 11HL shall be required for every project generating <br />fner-e th one hundred (100) or greater average daily <br />trips. <br />(e) (c) For developments of regional impact or Florida Quality Development projects, the <br />analysis required by Indian River County for the purposes of determining <br />concurrency and level of service compliance may be, at the director of public work's <br />option, the same as the transportation methodology agreed on for preparing the <br />application of development approval required by 380.06(10), Florida Statutes. <br />Otherwise, the required transportation analysis will be the same as that identified for <br />a traffic impact psis stud . <br />(6) General requirements. <br />(a) Submission of a traffic impact study is required for a determination of application <br />completeness, data sufficiency in the concurrency review process and identification <br />of needed traffic operations improvements. <br />(b) The applicant and/or his engineer is required to attend a pre -application conference <br />to discuss the traffic impact 44em&4 "" analysis study requirements, and report <br />outline as it pertains to his specific project prior to conduct of the study. <br />(c) Each traffic impact + + - ��+ ffanalysis study must meet the <br />�1=�-� �""Y"et <br />following submission requirements in order to receive a determination of application <br />completeness. <br />Bold Underline: Additions to Ordinance 4 <br />StFikO thMughi Deleted Text from Existing Ordinance <br />C:\Documents and Settings\tlister\Local Settings\Temporary Internet Files\Content.Outlook\QPAZMTU8\2012-019 952 and 910 Traffic.doc <br />�.RM90r. <br />TM <br />WA WATATAT <br />1Mr_T7.WTrff <br />WIN <br />.- <br />-MWAMT.MM_ <br />(db) Large proiect (100 daily trips or <br />greater). <br />A traffic impact analysis 11HL shall be required for every project generating <br />fner-e th one hundred (100) or greater average daily <br />trips. <br />(e) (c) For developments of regional impact or Florida Quality Development projects, the <br />analysis required by Indian River County for the purposes of determining <br />concurrency and level of service compliance may be, at the director of public work's <br />option, the same as the transportation methodology agreed on for preparing the <br />application of development approval required by 380.06(10), Florida Statutes. <br />Otherwise, the required transportation analysis will be the same as that identified for <br />a traffic impact psis stud . <br />(6) General requirements. <br />(a) Submission of a traffic impact study is required for a determination of application <br />completeness, data sufficiency in the concurrency review process and identification <br />of needed traffic operations improvements. <br />(b) The applicant and/or his engineer is required to attend a pre -application conference <br />to discuss the traffic impact 44em&4 "" analysis study requirements, and report <br />outline as it pertains to his specific project prior to conduct of the study. <br />(c) Each traffic impact + + - ��+ ffanalysis study must meet the <br />�1=�-� �""Y"et <br />following submission requirements in order to receive a determination of application <br />completeness. <br />Bold Underline: Additions to Ordinance 4 <br />StFikO thMughi Deleted Text from Existing Ordinance <br />C:\Documents and Settings\tlister\Local Settings\Temporary Internet Files\Content.Outlook\QPAZMTU8\2012-019 952 and 910 Traffic.doc <br />
The URL can be used to link to this page
Your browser does not support the video tag.