My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2012-019
CBCC
>
Ordinances
>
2010's
>
2012
>
2012-019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/11/2021 1:34:56 PM
Creation date
10/5/2015 9:15:10 AM
Metadata
Fields
Template:
Ordinances
Ordinance Number
2012-019
Adopted Date
07/10/2012
Agenda Item Number
4.A.
Ordinance Type
Impact Fees
State Filed Date
07\18\2012
Entity Name
Transportation Monitoring
Code Number
Chapters 952 and 910
Subject
Traffic Impact Fees
Codified or Exempt
Codified
Supplemental fields
SmeadsoftID
11339
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
28
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ORDINANCE 2012-019 <br />4412. Area of influence shall consist of be deterr„in the assigmnefft of <br />+ rri 1 1 fi r /G\ + fifty ltri <br />to a i r <br />those roadway segments assigned eight (8) or more project peak <br />season/peak hour/peak direction trips for a two-lane roadway or fifteen <br />(15) or more project peak season/peak hour/peak direction trips for a <br />four -lane (or wider) roadway (known as "significant' links or segments) <br />that lie within an eight (8) mile radius of the proiect; <br />4-213. Impacted segments traffic volumes; <br />414. Internal site circulation and access needs; <br />4415. Intersection analysis <br />eh link); (required at Collector and Arterial intersections on <br />significant links, where links are operating at 80% or greater of Level - <br />of -Service "D" and an approach link assigned eight (8) or more proiect <br />peak season/peak hour/peak direction trips for a two-lane roadway or <br />fifteen (15) or more proiect peak season/peak hour/peak direction kim <br />for a four -lane (or wider) roadway); <br />416. Segment analysis (optional traffic study of impacted segments which will <br />operate below FDOT adopted capacity) <br />4-617. Roadway needs (identification of proposed improvements and cost); <br />418. Appendix (as applicable to the specific traffic impact study): <br />a. Methodology agreements; <br />b. Traffic count worksheets; <br />C. Trip generation, internal and adjacent street capture worksheets; <br />d. Trip distribution and assignment worksheets; <br />e. Computerized travel time study printouts; <br />f. Intersection capacity analysis using 455 the latest highway <br />capacity analysis "Highway Capacity Manual" and worksheets <br />accepted by the Public Works Director or his designee; <br />g. Link analysis/computerized modeling (if performed); <br />h. Other analysis worksheets. <br />Bold Underline: Additions to Ordinance <br />Strike-thrseghi Deleted Text from Existing Ordinance <br />C:\Documents and Settings\tlister\Local Settings\Temporary Internet Files\Content.Outlook\QPAZMTU8\2012-019 952 and 910 Traffic.doc <br />
The URL can be used to link to this page
Your browser does not support the video tag.