Laserfiche WebLink
parking areas, attachment of utilities, or their <br />architectural/engineering fees. <br />Operational costs are such that the initial cost of the <br />facility represents only 10% of the costs over a 30 -year <br />period. <br />30 -YEAR LIFE CYCLE COST ANALYSIS <br />OF A DETENTION. FACILITY <br />A/E Fees <br />0.5% <br />Furnishings/ Equipment <br />1.5% <br />Construction <br />8.0% <br />Maintenance Supplies <br />1.0% <br />Food <br />8.0% <br />Utilities <br />3.0% <br />Salaries - Civilians <br />27.0% <br />Salaries - Sworn Personnel <br />51.0% <br />19 <br />Capital <br />Costs <br />1(196 <br />Operating <br />Costs <br />9096 <br />MAY 18 1983°°K3 pacq <br />