My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
5/18/1983
CBCC
>
Meetings
>
1980's
>
1983
>
5/18/1983
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/23/2015 11:50:00 AM
Creation date
6/11/2015 3:14:44 PM
Metadata
Fields
Template:
Meetings
Meeting Type
Regular Meeting
Document Type
Minutes
Meeting Date
05/18/1983
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
101
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ON MOTION by Commissioner Lyons, SECONDED <br />by Commissioner Scurlock, the Board unani- <br />mously approved items 2, 3 and 4 of Change <br />Order No. 1 with Ortega Industrial Contrac- <br />tors for South Beach Water System Improve- <br />ments - Phase I, and agreed to carry <br />consideration of item 1 over to the Special <br />Meeting of Wednesday, May .25, 1983. _ 7 --- <br />CONTRACT <br />Contract No. Date <br />Change Order No. 1 Location Indian River County, Florida <br />To: (Contractor) Ortega Industrial Contractors <br />You are hereby requested to comply with the following changes from the contract drawinga & specifications: <br />Item <br />No. <br />Description of Changes — Quantities, Units, Unit prices, <br />Change in Completion Schedule, Etc. <br />Decrease in <br />Contract Price <br />Increase in <br />Contract Price <br />1 <br />2 <br />3 <br />4 <br />{1) <br />Provide and install underground electrical service <br />to the Potable Water Booster Station, the Fire <br />Booster Station -and the existing Elevated Tank <br />$17,728.00 <br />(2) <br />Delete the chlorination system <br />$ 2,750.00 <br />(3) <br />Delete interior painting of ground storage tank <br />4,750.00 <br />(4) <br />Provide and install silent check valves in lieu of <br />all hydraulically actuated and lever & weight check <br />valves <br />8,000.00 <br />Change in contract price due to this Change Order. <br />Total Decrease <br />Total Increase <br />Difference between Col. (3) and (4): <br />Net (increase) (xl=xm) contract price <br />xxxxxxxxxxx <br />S17,728.00 <br />S 2,228.00 <br />S 2,228.00 <br />5 15,500-00 <br />xxxxxxxxxxx <br />S <br />The tum of S 2,228.00 is hereby added to, MMM fWm, the total contract price, and <br />the total adjusted contract price to date thereby is $ 662,666.00 <br />The time provided for completion in the contract is unchanged, kwrt d, AeoaavAj by , -0- • <br />calendar days. This document shall become an amendment to the contract and all provisions of the <br />contract will apply hereto. <br />Accepted by: <br />Contractor <br />Recommended by: <br />ss►nc:r t?atc <br />Requested by: s <br />®ernes etc <br />NOTE: York performed under this change order prior to Owner's concurrence is at the Contractor's <br />risk. <br />MAY 18 1983 67 600K .93 �Ac <br />
The URL can be used to link to this page
Your browser does not support the video tag.