Laserfiche WebLink
MAY 18 1993 �ar� <br />Status Report on South County Water System Improvements <br />Engineer Robbins gave the following report: <br />Part I - The Distribution System has been completed for.some <br />time; the FHA has given final inspection and signed off with <br />the exception of one intersection with a repair, and he will <br />submit a final pay request when that is done. Basically <br />Part I is finished. <br />Part II - Reverse Osmosis Equipment. Basically all the <br />items under that contract have been constructed and the <br />system is operational. It has been checked out and the 7 <br />days test performed. <br />Part III - Reverse Osmosis Equipment, Support <br />Facilities - They began pickling the membranes on Monday of <br />this week - which is for the purpose of keeping biological <br />material from growing in the membrane. Engineer Robbins <br />then reported on two technical problems in the plant. The <br />first _problem related to the hydraulic valves which did not <br />produce the flow rate for which the pumps were designed. The <br />valve supplier has come up with alternatives and they are <br />anticipating shipment of new valves the first week of June. <br />Engineer Robbins continued that the second problem related <br />to the performance of the degasification unit which was not <br />getting the hydrogen sulphide content in the water down to <br />0.5%. He reported that they have been working on this since <br />the 1st of March and have finally determined that the <br />problem was caused by adding chlorine just after the <br />degasification process. The chlorine injection point has <br />been changed, with the result that they are now getting 0 <br />hydrogen sulphide concentration. <br />Administrator Wright asked if this change requires the <br />use of more chlorine, and Engineer Robbins said it does not.. <br />Commissioner Scurlock commented that it appears the <br />utility costs are running significantly over what we <br />anticipated, and Mr. Robbins noted that the budget was based <br />68 <br />