My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
6/1/1983
CBCC
>
Meetings
>
1980's
>
1983
>
6/1/1983
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/23/2015 11:50:01 AM
Creation date
6/11/2015 3:33:34 PM
Metadata
Fields
Template:
Meetings
Meeting Type
Regular Meeting
Document Type
Minutes
Meeting Date
06/01/1983
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
45
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
r <br />Chairman Bird felt that since all the utilities in this <br />area are underground, he would hate fiar us to be the only one to <br />be inconsistent with the area. <br />The Chairman CALLED FOR THE QUESTION. <br />The Motion was voted on and carried <br />unanimously. <br />SECTION M <br />CONTP.ACT CHANGE ORDER FORM <br />Contract No. Date <br />Change Order No. 1 Location Indian River County, Florida <br />To: (Contractor) __Ortega Industrial Contractors <br />You are hereby requested to comply with. the fallowing changes from the contract drawings & specifications: <br />Item <br />No. <br />Description of Changes - Quantities, Units, Unit Prices, <br />Change in Completion Schedule, Etc. <br />Decrease in <br />Contract Price <br />Increase in <br />Contract Price <br />1 <br />2 <br />3 <br />4 <br />(1) <br />Provide and install underground electrical service <br />to the Potable Water Booster Station, the Fire <br />Booster Station and the existing Elevated Tank <br />$17,728.00 <br />(2) <br />Delete the chlorination system <br />$ 2,750.00 <br />(3) <br />Delete interior painting of ground storage tank <br />4,750.00 <br />(4) <br />Provide and install silent check valves in lieu of <br />all hydraulically actuated and lever & weight check <br />valves <br />8,000.00 <br />Change in contract price due to this Change Order: <br />' <br />Total Decrease <br />Total Increase <br />Difference between Col. (3) and (4): <br />Net (increase) W= ) contract price <br />xxxxxxxxxxx <br />S17,728.00 <br />S 2,228.00 <br />2,228.00 <br />S' 15 500.00 <br />xxxxxxxxxxx <br />S <br />S IS <br />The sum of S 2,228.00 is hereby added to, dffuVtU fkorh, the total contract price, and <br />the total adjusted contract price to date thereby is S 662,666.00 <br />The time provided for completion in the contract is unchanged, imetixod, d1farM6d, by -0- <br />calendar days. This document shall become an amendment to the contract and all provisions of the <br />contract will apply hereto. 1) <br />Accepted by. <br />Recommended t <br />Requested by: <br />NOTE: Work performed under this change order prior to <br />risk. <br />21 <br />9-i2-63 <br />Dau <br />D,« <br />uc <br />Owner's concurrence is at the Contractor's <br />
The URL can be used to link to this page
Your browser does not support the video tag.