My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
6/1/1983
CBCC
>
Meetings
>
1980's
>
1983
>
6/1/1983
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/23/2015 11:50:01 AM
Creation date
6/11/2015 3:33:34 PM
Metadata
Fields
Template:
Meetings
Meeting Type
Regular Meeting
Document Type
Minutes
Meeting Date
06/01/1983
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
45
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Change Order No. 2 <br />This change order•is for the extension of water service the°full length of St. Christopher <br />Lane and Sea Turtle Lane for a total cost of $10,800.00 (ten thousand eight hundred <br />dollars and no cents). This amount of money will be paid for in full by those residing <br />on the lanes who have previously paid impact fees. There will also be an agreement entered <br />into between the County and those connecting now that if and when others are permitted <br />to connect to those lines some proportional reimbursement will be made to the customers <br />who originally connected. <br />R ECC' -N EVDATI0% : <br />14e recommend approval of the two change orders and recommend the Chairman be authorized <br />to sign same. <br />Administrator Wright recommended approval of Item 1 of <br />Change Order #1 for $17,728.00, noting that the remaining <br />items on the Change Order, as well as Change Order #2, had <br />been approved at the last meeting. <br />MOTION WAS MADE by Commissioner Scurlock, <br />SECONDED by Commissioner Bowman, that the <br />Board approve Item 1 Change Order #1 for <br />South Beach Water System Improvements - <br />Phase I, in the amount of $17,728. <br />In discussion, Commissioner Scurlock asked if there had <br />been any followup with the City of Vero Beach to see if <br />there were options available other than going underground <br />with the utilities, and Administrator Wright explained that <br />the change order was according to the City's instructions <br />and recommendations, and there had not been any further <br />negotiations on options. He stated that we have to rely on <br />our consulting engineer and this was his recommendation. It <br />was also the recommendation of Utilities Director Pinto that <br />it be accepted. <br />Commissioner Scurlock felt $17,000 was a large amount <br />of money for burying lines instead of going overhead in just <br />this one spot. <br />20 <br />SUN 1 13 imi 53, nct 642 _J <br />
The URL can be used to link to this page
Your browser does not support the video tag.