Laserfiche WebLink
JUN 1 1983 <br />�� b " 53 F,�T <br />ON MOTION by Commissioner Scurlock, <br />SECONDED by Commissioner Wodtke, the <br />Board unanimously approved execution of <br />acceptance and authorized the County <br />Attorney to record the document, as <br />recommended by staff. <br />CHANGE ORDERS #1 - SOUTH BEACH WATER SYSTEM IMPROVEMENTS - <br />PHASE I <br />The Board reviewed the following memo dated 5/12/83: <br />TO: The Honorable Members of the DATE: 4 12, 1983 FILE: <br />Board of County Commissioners <br />THROUGH: Michael Wright <br />County Administrator <br />SUBJECT: CHANGE ORDERS FOR SOUTH BEACH <br />WATER SYSTEM IMPROVEMENTS -PHASE I <br />i <br />�Gr'anJ'teC�G. Pin o <br />FROM: REFERENCES: <br />Utility Services Director <br />DESCRIPTION AND CONDITIONS: <br />Change Order No. 1 <br />(1) The original plans and specifications called for the installation of electrical <br />service to the water booster station and elevated tank to be overhead. <br />We have been informed by Mr. John Robbins, P. E., of Sverdrup & Parcel that it is re- <br />quired by the City of Vero Beach Utilities Department that the service be installed under- <br />ground which necessitates a change in our contract and an increase in cost of $17,728.00 <br />(seventeen hundrea twenty-eight dollars and no cents). <br />(2) The deletion of chlorination system is due to the Department of Environmental Regulation <br />informing us that the addition of chlorine at this point in the system is not desired so <br />therefore we ask that it be removed from the contract. This will decrease contract <br />$2,750.00 (twenty-seven hundred fifty dollars and no cents). <br />(3) Deletion of painting the interior of ground storage tank will decrease contract <br />$4,750.00 (forty-seven hundred and fifty dollars and no cents). We feel it is an un- <br />necessary expense and ask that it be deleted from the contract. <br />(4) The original contract provides for -the installation of hydraulically actuated check <br />valves which we feel are not necessary and that a silent check valve would be more practi- <br />cable for this. application. This will result in a decrease of $8,000 (eight thousand <br />dollars and no cents) in our contract. <br />With the addition of item #1 and the deletion of items #2, 3 and 4, this will represent <br />an increase in the contract of $2,228.00 (two thousand twenty-eight dollars and no cents) <br />for Change Order No..l. <br />19 <br />� � r <br />