My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
7/6/1983
CBCC
>
Meetings
>
1980's
>
1983
>
7/6/1983
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/23/2015 11:50:01 AM
Creation date
6/4/2015 11:39:25 AM
Metadata
Fields
Template:
Meetings
Meeting Type
Regular Meeting
Document Type
Minutes
Meeting Date
07/06/1983
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
95
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
JUL 193 aII U 9 <br />Alternative 4 (See Figure 4 - Appendix A) <br />This alternative considers the construction of forcemains from <br />Ixora Park and Whispering Palms extending along the South Relief Canal to <br />1st Street then north on US 1 to 10th Street to a refitted Tropic Villas <br />Pump Station. The pump station at Tropic Villas is overdesigned as far <br />as the wetwell is concerned to handle additional capacity from the 6th <br />Avenue and 12th Street area. There is the potential to tie-in additional <br />customers if they tied in along the forcemain route. In the event a <br />treatment facility is constructed west of town, the pumping system could <br />be reversed. <br />Alternative 5 (See Figure 5 - Appendix A) <br />Alternative 5 is similar to Alternative 4 with the exception the <br />forcemain would tie into a gravity sewer system constructed along 6th <br />Avenue. This alternative will offer the capacity for additional tie-ins. <br />The gravity sewer system along 6th Avenue will eliminate existing <br />package treatment plants located within the 6th Avenue -12th Street area. <br />Alternative 6 (See Figure 6 - Appendix A) <br />This alternative is very similar to Alternative 4 with the excep- <br />tion the forcemain route from the two areas would extend along the .South <br />Relief Canal to Old Dixie Highway, thence continuing north on Old Dixie <br />to 4th Street, across the F.E.C. railroad and eventually tieing into <br />US 1 and to a refitted Tropic Villas Pump Station. The rationale behind <br />this alternative is there is a package treatment plant located in a <br />mobile home park that would be eliminated. This alternative will also <br />allow a reversal of the pumping system should a treatment facility be <br />constructed west of town. There is also the potential to tie-in addi- <br />tional customers. <br />Alternative 7 (See Figure 7 - Appendix A) <br />Alternative 7 proposes the same forcemain route as Alternative 6 <br />with the exception the forcemain would tie into a gravity sewer system <br />at 6th Avenue. This alternative will allow additional connections and <br />eliminate package plants along 6th Avenue but will require the re- <br />fitting of the Tropic Villas Pump Station. <br />Alternative 8 -(See Figure 8 - Appendix A) <br />This alternative wound bring a forcemain north along Lateral E <br />Canal past the Old Hibiscus Airpark to 12th Street, then east to the <br />26 <br />M M M <br />
The URL can be used to link to this page
Your browser does not support the video tag.