My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
7/18/1983
CBCC
>
Meetings
>
1980's
>
1983
>
7/18/1983
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/23/2015 11:50:01 AM
Creation date
6/11/2015 2:59:50 PM
Metadata
Fields
Template:
Meetings
Meeting Type
Special Call Meeting
Document Type
Minutes
Meeting Date
07/18/1983
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
17
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
1 <br />1 <br />CD I <br />Policy Analysis for Hutchinson Island <br />Resource Management Plan <br />(As amended by the Indian River County Ad Hoc Committee) <br />July 18, 1983 <br />Related Citation in Indian <br />River County Comprehensive Plan Proposed Policy <br />7. N/A 1. Shoreline use shall be limited to water or water dependent uses which comply with the <br />activities and exceptions described for environmentally sensitive resources. <br />(See pg. 11 & 12). <br />B. Page 86 Historic & Scenic Preservation (b) efforts should be made to provide, enhance and preserve scenic views <br />of the water through such measures as site design requirements and building n <br />design criteria. <br />9. Page 88 #3, Page 88 #5, Page 88 #6 1. To protect beaches and dunes from erosion, dune stabilization and restoration <br />shall be undertaken through implementation of long-term management plans that <br />utilize natural coastal dynamics. <br />10. N/A Consideration should be given to establishing a "dune preservation zone" landward <br />of the Coastal Construction Control Line (CCCL). <br />11. <br />N/A <br />(g) Requiring those who benefit from shoreline stabilization efforts, including <br />re-establishing dune systems, to provide the necessary funding. <br />12. <br />N/A <br />(h) Requiring that dune system restoration, where needed, be included in beach <br />renourishm mt projects. <br />13. <br />N/A <br />(i) The counties shall request the State to resurvey the coastal construction <br />control line not less frequently than once every 5 years. <br />Cn <br />00 <br />14. <br />N/A <br />2. To facilitate the recharging of groundwater and minimize stoimtaater run-off, <br />impervious surfaces should be held toa minimum and porous materials should be <br />CO <br />substituted to the maximum extent practicable. <br />J <br />3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.