My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
7/20/1983
CBCC
>
Meetings
>
1980's
>
1983
>
7/20/1983
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/23/2015 11:50:01 AM
Creation date
6/11/2015 3:02:20 PM
Metadata
Fields
Template:
Meetings
Meeting Type
Regular Meeting
Document Type
Minutes
Meeting Date
07/20/1983
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
149
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Alternative No. 3 <br />Locate the ramp and dock on the south side of Wabasso Road just east of <br />the existing ramp. See Location No. 3 on map. A paved road leads to the <br />ramp. This location is visible from the CR510 causeway. Two feet of water <br />at proposed ramp with 3 to 4 feet of water 100 feet from shore at mean low <br />water. <br />I have contacted Mr. McQueen who represents the Marsh Island developer (Zaremba <br />Communities) and also contacted Dr. Holt, and Colonel Cooper, Orchid Island property <br />owners. They are opposed to Location No. 2 because of the extra traffic and con- <br />gested parking which would occur on the County road leading to Orchid Island and <br />next to the Marsh Island property. They feel the ramp at this location would also <br />disrupt fishing from the bulkhead, and there are wakes from.large boats on the <br />Intracoastal Waterway. Their comments were that most of the neighborhood prefers <br />Location No. l.or No. 3.. - <br />The Marsh Island Developer or property owners are not opposed to Location No. 1 <br />or No. 3. <br />RECOMMENDATIONS AND FUNDING <br />It is requested that the Board of County Commissioners approve the boat ramp project <br />and approve one of the three proposed locations, and approve the expenditure of <br />$100 for the DER/DNR joint permit, application to be applied for. -Based on all of <br />the above information, staff recommends location No. 3. _. <br />No other funding has to be considered except for the $100 permit fee which shall <br />come from Road and Bridge budgeted funds. <br />e e�ED SITES FDR <br />BoAr RAMP f bacK —_ <br />D' iN lk—F&wT Ar <br />mn^m Low WATa16 <br />63 <br />bcox 54 PAGE 159 <br />
The URL can be used to link to this page
Your browser does not support the video tag.