My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
8/3/1983
CBCC
>
Meetings
>
1980's
>
1983
>
8/3/1983
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/23/2015 11:50:01 AM
Creation date
6/11/2015 3:04:25 PM
Metadata
Fields
Template:
Meetings
Meeting Type
Regular Meeting
Document Type
Minutes
Meeting Date
08/03/1983
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
85
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CHANGE <br />%_ <br />DiStTlIM11011 tui <br />ORDER <br />OWNER <br />AIA DOCUMENT <br />ARCHITECT <br />6701 CONTRACTOR <br />El <br />FIELD <br />1-1 <br />OTHUR <br />LJ_ <br />County <br />PROJECT: 8301,8302,4303,8304,8305 <br />CHANGE ORDIR NUMBER: 8301-1 <br />(name, address) <br />Double Surface Treatment Paving Imp. - <br />Indian River County, Florida <br />INITIATION DATE: August 1, 1983 <br />TO (Contractor): <br />Engineer I <br />F <br />A4WAW <br />YI PROJECT NO: 83-1,83-2 <br />n4 1— <br />rson Florida, Inc CONTRACT FOR: Double Surface Treatment Paving <br />P.O. Drawer 719 Improvements <br />Stuart, Fl. 33493 <br />L _J CONTRACT DATE: August 1, 1983 <br />You are directed to make the following changes in this Contract: <br />1) Revise the Contract Sun on Page,PA-1 from $135,800.00 to $96,932.45 <br />This change is a result of the County having exercised its right -under <br />the orginal contract -documents, Page FA -4 to construct 14,667 s.y, of <br />soil cement base for Project # 8301 and 8303 under the existing annual <br />contract with Dickerson Florida, Inc. prior to the date of execution of <br />this contract and change order. <br />Not valid until signed by both the Owner and //C//,/c/ Engineer <br />Signature of, the Contractor indicates his agreement herewith, including any adjustment in the Contract Sum or Contract Time. <br />The original (Contract Sum) was ..................... <br />$135,800 <br />Net change by previously authorized Change Orders ................................... $ 0 <br />13- <br />5 <br />The (Contract Sum) (Guaranteed Maximum Cost) prior to this Change Order was .......... $ '800 <br />The (Contract Sum) (9000000abWadm4wabm will be (�� decreased) i9oabmag& <br />by this Change Order ..................................... ................... $ 38,867.55 <br />The new (Contract Sum) including this Change Order will be ... $ 96,932. . 45 <br />The Contract Time will be (bMucvcdbbb&(n0t0&(unchanged) by Days. <br />The Date of Substantial Completion as of the date of this Change Order therefore is September 29 1983 <br />DICKERSON FLORIDA, Inc. <br />Xumft Engineer CONTRV-.A(J E)RAWtK / I <br />H'Ift"I <br />Address AdZWFRT3,1,-FI.,0R1DA 33495- <br />C <br />DA _ <br />CD�A <br />By <br />? ��J <br />�'3 <br />AIA DOCUMENT 6701 . CHANGE ORDEK - 1 <br />THL AMERICAN INSTITUTE Of ARCHITECTS, 1735 NEW <br />-AUG 11983 <br />AIA' . Q 19"ti <br />iNL-kiN, DA. _14Axx, <br />39a <br />Authorff. <br />MY 25th Street <br />Adclrest. <br />BY <br />DAIE 8/3/83 <br />6701 <br />i9ag 54 PAU 9MA <br />
The URL can be used to link to this page
Your browser does not support the video tag.