Laserfiche WebLink
1 <br />FINAL COST FOR: <br />1ST STREET BETWEEN 16TH AVENUE AND 18TH AVENUE <br />DATE: August 15, 2000 TOTAL F.F. <br />PROJECT NO. 9721 TOTAL L.F. <br />FINAL COST <br />919.10 <br />506.71 <br />CONSTRUCTION <br />Labor $8,545.95 <br />Outside Labor $161.04 <br />Equipment $6,428.64 <br />Equipment Rental $91.83 <br />Asphalt $2,746.61 <br />Concrete $104.04 <br />Sod $2,540.46 <br />Pipe/Culverts $1,118.05 <br />Stabilizer& Limerock $1,996.64 <br />Engineering Tests $68.45 <br />Miscellaneous $7.86 <br />TOTAL CONSTRUCTION COSTS: $23,809.57 $23,809.57 <br />PERMIT FEES $350.00 $350.00 <br />ENGINEERING <br />($2.59 /L.F.) $2.59 x 506.71 $1,312.38 $1,312.38 <br />Sub -Total $25,471.95 <br />Administration 2.999613% $764.06 <br />Recording Fees $87.50 <br />25% County's Cost <br />75% Property Owner's Assessment <br />2% Collection Fee (75% Figure) <br />TOTAL COST TO PROPERTY OWNERS: <br />Assessment = <br />$20,137.49 <br />919.1 FF <br />TOTAL $26,323.51 <br />$6,580.88 <br />$19,742.63 <br />$394.85 <br />$20,137.49 <br />$21.91 <br />$20,137.49 <br />9721 FCST.WK4 09/29/2000 <br />