Laserfiche WebLink
WATER RATE <br />3/4" meter (min.) 1st 3,000 gal/water <br />used <br />$ 7.84 <br />1" meter <br />(min.) 1st <br />4,000 gal/water used <br />12" meter <br />12.12 <br />11" meter <br />(min.) 1st <br />8,000 gal/water <br />used <br />16.40 <br />la" meter <br />(min.) 1st <br />12,000 gal/water <br />used <br />31.36 <br />2" meter <br />(min.) 1st <br />16,000 gal/water <br />used <br />39.20 <br />All usage in excess of the aforementioned will be charged on <br />a basis of $1.50 per 1,000 gallons. <br />SEWER RATE <br />1.5 times the water charge. <br />The proposed rates are: <br />WATER RATE - MONTHLY BASE FACILITY CHARGE <br />5/8" meter <br />$32.00 <br />1" meter <br />75.00 <br />_ <br />14" meter <br />100.00 <br />12" meter <br />250.00 <br />2" meter <br />300.00 <br />GALLONAGE FEE <br />All water usage will be billed at $1.50 per 1,000 gallons and <br />sewage will be billed at 1.5 x the water charge. <br />ALTERNATIVES AND ANALYSES: <br />Roseland Plaza Shopping Center will be operating at a deficit even <br />with the increase in rates proposed. <br />RECOMMENDATION: <br />Staff recommends the Commission approve this request for a rate <br />increase. <br />Vice Chairman Scurlock explained the procedure to be <br />followed for a Public Hearing and asked if anyone present <br />had an objection to this matter being heard before only <br />three commissioners. There were none. <br />Mrs. Joyce Hamilton, Administrative Assistant - <br />Utilities Department, presented staff recommendation to <br />approve the rate increase as the present operating costs are <br />not being met by the rate structure. <br />Administrator Wright stated that the proposed rate <br />increase will just recover their costs. This is a very small <br />- franchise and his understanding of why they had a franchise <br />was that it was not a continuous building and falls under <br />the definition of needing a franchise. He recommended that <br />14 <br />OCT -5 1993 bac 82 <br />