My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
11/9/1983
CBCC
>
Meetings
>
1980's
>
1983
>
11/9/1983
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/23/2015 11:50:02 AM
Creation date
6/11/2015 3:40:39 PM
Metadata
Fields
Template:
Meetings
Meeting Type
Special Call Meeting
Document Type
Minutes
Meeting Date
11/09/1983
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
52
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
NOV 9 1933 <br />so 55 rAu 2,51, <br />$2,500 to connect a customer to the system. They are now <br />collecting $1,500 in contributions, leaving the same $1,000 <br />to be collected through the monthly rates. What they are <br />doing is adjusting the contributions amount to offset <br />increasing capital costs of providing service to keep things <br />equal so everybody is paying the same amount through their <br />monthly rates. <br />Attorney Roen called Mr. Morris. <br />Court Reporter Zambataro swore in Curtis Morris, <br />Division Director for General Development Utilities in the <br />Port St. Lucie, Vero and Silver Spring Shores projects, <br />whose business address is 901 Pruynville Rd., Port St. <br />Lucie, Fla. Mr. Morris stated that he is responsible for <br />the general supervision of the water and sewer operations in <br />Vero Shores and Highlands. He then reviewed Exhibit C, as <br />follows, noting that the system is in compliance with all <br />applicable treatment standards and the system in 1982 was <br />basically the same as it is today. <br />16 <br />
The URL can be used to link to this page
Your browser does not support the video tag.