My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1/4/1984
CBCC
>
Meetings
>
1980's
>
1984
>
1/4/1984
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/23/2015 11:50:23 AM
Creation date
6/11/2015 3:53:27 PM
Metadata
Fields
Template:
Meetings
Meeting Type
Regular Meeting
Document Type
Minutes
Meeting Date
01/04/1984
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
71
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CHANGE <br />ORDER <br />AIA OOCUMEN) G701 <br />Distribution Io <br />OWN tk <br />ARCI 11 11 ('11 <br />[ ] <br />CONIRACTOR LI <br />11111) [:I <br />011 It k L7 <br />PROJECT: D12W__#-8102 CIIANG ()kl)t R NUABE-R: 8102 -IV -1 <br />(name, addressi Indian River County Tracking Station <br />INITIATION -DATE: Dec. 27, 1983 <br />TO (Contractor). <br />Engineers' PROJECT NO: 8102 <br />E.W,H.,IlVC. D/B/A <br />Sunnyland Irrigation CONTRACT Ft?h: Irrigation System <br />P.O. Box 1509 <br />L Jensen Beach, Fl. 33457 CONTRACT DATE: June 9, 1983 <br />You are directed to make the following changes in this Contract: <br />1) Add new Zone Al including -4 full circle Irrigation heads, piping, valve, wiring, <br />and necessary incidentals. I Cost= $246 <br />2) Add 2 additional pop-up heads to Zone F Cost= $ 28 <br />3) Add 1 additional pop-up head to Zone C Cost= $ 14 <br />4) Relocate and change Zone D spriniker heads to <br />Super 600's. Cost $176 <br />$464 <br />rA <br />Not valid until signed by both the Owner and Architect. <br />Signature of the Contractor indicates his agreement herewith, including any a(llustment in the Contract Sum or Contract rime. <br />The original (Contract Sum) (Guaranteed Maximum Cost) was ............................ $ 4981.00 <br />Net change by previously authorized Change Orders ................................... $ —0— <br />The (Cuntrac t Sum) (Guaranteed Maximum Cost) prior to this Change Order Was .......... $ <br />The (Contract Sum) (Guaranteed Maximum Cost) will be (incredscd) ((100000CK () 464.00 <br />by this Change Order.......................................................... $ <br />The new (Contract Sum) (Guaranteed Maximum Cost) including this Change Order will be ... $ 5445.00 <br />The Contract Time will be (increased) (decreased) (unchanged) by ( ) Days. <br />The Date of Substantial Completion as of the date of this Change Order therefore is <br />E.W.H, , Inc D/B/A Authorized: <br />James W. Davis, P.E. Sunnyland Irrigation Indian River County <br />ARCt18T40 7 neer25thStreet cc�v�tnc l 1509 YNN *R2 th Streetty <br />Address <br />Address Add ress -Address <br />Vero Beach, Fl. 32960 Jensen Beacn, Fl. 33457 Vero Beach Florida 12-9660 <br />BY BY _ HY_�^"` <br />DATE DATE DATE !' C "07 <br />AIA DOCUMENT 0701 CHANGE NGE UkUEk AI'kll 14i11 EUI11C)N AIA- M. I 97 <br />THE AMEKICAN INSTITUIE Of AKCHITECIS, 1735 NEW 1UKK AVE., N.W., WASHINI.ION, DA .:uIMK, 6701 -- 1978 <br />7a <br />
The URL can be used to link to this page
Your browser does not support the video tag.