Laserfiche WebLink
I <br />a <br />more consistent than our present policy with petition <br />paving. <br />Administrator Wright believed the cost 'involved would <br />be between $18-$23 per front foot since in this case only <br />the people on one side of the road would be paying. <br />Commissioner Wodtke felt if they bring the road up to <br />standard, he would be agreeable to accepting it, but noted <br />we cannot do this work with our road crews. <br />Commissioner Bird asked about the possibility of the <br />County doing some road design work, and Administrator Wright <br />stated that is where we are so stacked up that we won't see <br />daylight all year. He felt we could provide some technical <br />assistance, however. <br />- Director Davis -believed his department could do a very <br />quick cost estimate and design on a conceptual basis that <br />would be fairly accurate, and could be given to three or <br />four local contractors to ask for a cost estimate. He <br />believed that there could be a problem working with two <br />subdivisions to get a common ditch. <br />Mr. Youngman did not see how the people in the <br />adjoining subdivision would have much choice as he did not <br />see how they can maintain their ditches the way it is set up <br />presently, and Mr. Wiggins reported that the property owners <br />in Country Walk are having problems as they were not aware <br />that they had to maintain this ditch. He stated that they <br />do not want to accept the ditch, the roads or the lighting, <br />etc., and have told the developer he has a lot to do before <br />they would consider forming a property owner's association <br />to take these over. <br />Commissioner Bird felt we need one county maintained' <br />ditch between two developments. <br />ON MOTION MADE by Commissioner Bird, SECONDED <br />by Commissioner Bowman, the Board unanimously <br />54 <br />640K U 4 <br />PAGE X:4 <br />