My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
3/21/1984
CBCC
>
Meetings
>
1980's
>
1984
>
3/21/1984
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/23/2015 11:50:23 AM
Creation date
6/11/2015 4:38:10 PM
Metadata
Fields
Template:
Meetings
Meeting Type
Regular Meeting
Document Type
Minutes
Meeting Date
03/21/1984
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
57
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
MAR 211984 <br />B®OK PACE 489 <br />TO: The Honorable Members of DATE: March 12, 1984 FILE: <br />the Board of County Commissioners <br />THROUGH: Michael Wright, <br />County Administrator SUBJECT: <br />Traffic Signal Maintenance and Operation <br />James W. Davis, P.E. Order 1-84 (U.S. 1 at Eighth Street) <br />Public Works Direct <br />c;;? <br />L. Orr,',/� REFERENCES: <br />Traffic Engineer <br />DESCRIPTION AND CONDITIONS <br />The Florida Department of Transportation has granted the County's request to <br />install a traffic signal at the intersection of U.S. 1 and Eighth Street. <br />This intersection is expected to become more congested in association with <br />the scheduled improvements to Eighth Street between Old Dixie Highway and <br />Sixth Avenue. <br />Indian River County will be responsible for the entire cost of signal instal- <br />lation. Upgraded equipment has been requested through F.D.O.T.'s equipment <br />purchase program, but should not be received until 1985. <br />ALTERNATIVES AND ANALYSIS. I <br />A. Authorize the Chairman to sign the attached Maintenance and Operation Order <br />(four copies) and install a traffic signal at the intersection of U.S. 1 <br />and Eighth Street. <br />B. Deny acceptance of the Maintenance and Operation Order and installation of <br />a traffic signal at U.S. 1 and Eighth Street. <br />RECOMMENDATION AND FUNDING <br />Alternative A is recommended since the intersection of U.S. 1 and Eighth Street <br />will be severely impacted after improvements to Eighth Street between Old Dixie <br />Highway and Sixth Avenue are completed this summer. <br />Surplus equipment will be available from the Sixteenth Street project which can <br />be used at the proposed signal. Budgeted funds are available to construct the <br />signal (estimated at $5000.00) using in-house labor. <br />ON MOTION by Commissioner Lyons, SECONDED <br />by Commissioner Wodtke, the Board unanimously <br />authorized the Chairman to sign the DOT Mainte- <br />nance and Operation Order re installation of <br />a traffic signal at the intersection of U.S.1 <br />and 8th Street as recommended by staff. <br />44 <br />
The URL can be used to link to this page
Your browser does not support the video tag.