My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
3/21/1984
CBCC
>
Meetings
>
1980's
>
1984
>
3/21/1984
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/23/2015 11:50:23 AM
Creation date
6/11/2015 4:38:10 PM
Metadata
Fields
Template:
Meetings
Meeting Type
Regular Meeting
Document Type
Minutes
Meeting Date
03/21/1984
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
57
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
PROPOSED REVISED RESTRICTIONS - BARBER BRIDGE <br />Traffic Engineer Michael Orr reviewed the following <br />memo and letter from the Vice Mayor of Sebastian: <br />TO: The Honorable Members of DATE: March 13, 1984 FILE: <br />the Board of County Commissioners <br />THROUGH: Michael Wright, <br />County Administrator <br />SUBJECT: State Road 60 Bridge (Barber B_ric <br />Public Works Directo <br />James W. Davis, P.E. Proposed Revised Restrictions <br />r <br />FROM: Michael L. Orrl&w REFERENCES: <br />Traffic Engineer <br />DESCRIPTION AND CONDITIONS <br />A study of the adequacy of existing bridge opening restrictions <br />was directed by the. Transportation Planning Committee in March, <br />1983 due to excessive number of bridge openings combined with. <br />an increasing traffic volume. <br />Traffic counts were obtained and submitted to the Florida <br />Department of Transportation for analysis and recommendations <br />to the U.S. Coast Guard. <br />The attached amendment to bridge operations are proposed by the <br />Coast Guard as published in the Federal Register. Comments are <br />due from the public by March 29, 1984. <br />ALTERNATIVES AND ANALYSIS <br />A. Approve the bridge opening schedule proposed by the Coast <br />Guard for the _December 1 - April 30 season. This schedule <br />establishes legal bridge openings once per quarter hour <br />for weekdays. (This schedule does not include provisions <br />for peak hours or for weekends). <br />B. Recommend a revised schedule to the Coast Guard, considering <br />peak hour and weekend traffic, as follows for the December <br />1 - April 30 season: <br />1. For weekday peak traffic periods (7:45 a.m. to 9:00 a.m., <br />12:00 noon to 1:15 p.m., 4:OOp.m. to 5:15 p.m.) open <br />once at 8:30 a.m., 12:30 p.m. and at 4:40 p.m. <br />2. During non -peak weekday periods, weekends and holidays, <br />open once per quarter hour as demanded. <br />RECOMMENDATION AND FUNDING <br />Alternative B is recommended to better serve peak traffic periods <br />and to establish a bridge opening schedule during weekends and <br />holidays. <br />No County funds are required. <br />45 <br />MAR 21 1984 <br />�0a6 FACE <br />
The URL can be used to link to this page
Your browser does not support the video tag.