My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
4/4/1984
CBCC
>
Meetings
>
1980's
>
1984
>
4/4/1984
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/23/2015 11:50:24 AM
Creation date
6/11/2015 4:39:39 PM
Metadata
Fields
Template:
Meetings
Meeting Type
Regular Meeting
Document Type
Minutes
Meeting Date
04/04/1984
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
105
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
APR 4 1984BOOK 56, FAGS 520 <br />Chairman Scurlock asked if the boardwalk by Pebble <br />Beach Villas could be repaired with the money that was left <br />over from this project. <br />Administrator Wright advised that there is $20,000 left <br />over, but the boardwalk was not included in this particular <br />project. <br />General Services Director Thomas confirmed that the <br />boardwalk leading to the crossover at that location was not <br />included in the original DNR funds, but can be taken care of <br />in-house. The bids that have gone out are for the <br />demolition and replacement of the existing, somewhat <br />dilapidated structure there. <br />OMB Director Barton explained that the above budget <br />amendment just covers the funds that we have received from <br />the State so far. <br />ON MOTION by Commissioner Bird, <br />SECONDED by Commissioner Wodtke, the Board <br />unanimously (4-0) approved the above budget <br />amendment, as recommended by OMB Director Barton. <br />G. Bid #196 - Hardware for Traffic Signs <br />The <br />Board reviewed <br />the following memo dated <br />3/22/84: <br />FILE: <br />TO: Board of County <br />Commissioners <br />DATE: March 22, 1984 <br />THRU: Michael Wright SUBJECT: IRC BID #196 - Hardware for <br />County Administrator Traffic Signs <br />FROM: REFERENCES: <br />Caro y Goodrich, Manager <br />Purcha ing Department <br />1. Description and Conditions <br />Bids were received March 20, 1984 at 11:00 A.M. for IRC #196 - Hardware - <br />Traffic Signs for the Traffic Engineering Department. <br />7 Bid Proposals were sent out, 3 bids were received. <br />10 <br />
The URL can be used to link to this page
Your browser does not support the video tag.