My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
4/4/1984
CBCC
>
Meetings
>
1980's
>
1984
>
4/4/1984
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/23/2015 11:50:24 AM
Creation date
6/11/2015 4:39:39 PM
Metadata
Fields
Template:
Meetings
Meeting Type
Regular Meeting
Document Type
Minutes
Meeting Date
04/04/1984
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
105
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
APR 4 1984 <br />BOOK 56 PAGE 524 <br />Commissioner Scurlock was disturbed that just one bid <br />was received because he always likes to see competition. <br />Mike Orr, Traffic Engineer, believed that there was <br />only one company in this area that does this sort of thing. <br />A few contractors called him about the bid, but they did not <br />follow through and submit a bid. He suspected that the job <br />might be too small. Mr. Orr believed that the bid was not <br />out of line. <br />Commissioner Wodtke suggested that the wording in the <br />above memo should have read that five bids were "solicited" <br />instead of five bids were "submitted" and only one bid was <br />received. <br />ON MOTION by Commissioner Wodtke, <br />SECONDED by Commissioner Bird, the Board <br />unanimously (4-0) awarded Bid #197 to <br />Signal Construction Co. of Jupiter, Florida, <br />for traffic signal improvements at three <br />intersections, as recommended by Traffic <br />Engineer Mike Orr. <br />14 <br />
The URL can be used to link to this page
Your browser does not support the video tag.