Laserfiche WebLink
INDIAN RIVER COUNTY <br />DATE: May 16, 1934 <br />WORK AUTHORIZATION NO. 001 FOR ENGINEERING SERVICES <br />PROJECT NO. (County) 2130 -1 -SR (Carter/WH&S) <br />TITLE: Master Plan for Area Wide Wastewater Program <br />I. PROJECT DESCRIPTION <br />The Consultant is to develop the master plan taking into account and <br />utilizing the "Master Plan for an Area Wide Water and Sewerage Program" <br />developed by the Joint -Venture of Sverdrup and Parcel, and Beindorf and <br />Associates in April 1973. The 1973 master plan is to be evaluated and <br />updated or modified to address the presently existing needs. <br />The Consultant is to provide a report of his findings and present it to <br />the Board of County Commissioners for review. The report is to have <br />recommendations as to the extent of the master plans that would be- cost <br />effective to implement and would be in the best interest of the public <br />at this •time. The study areas for this report are the Gifford <br />Wastewater System, the North County Area Wabasso, the Mainland South <br />County Area, the State Road 60 Corridor to Oslo Road, and the South . <br />Beach Area. <br />II. SCOPE OF SERVICES <br />The engineer shall provide engineering services addressing the following: <br />A. Study the comprehensive land use plan, historical growth pattern and <br />other information available to project year 2000 population for the <br />study area. This projection will include a 5 year projection for <br />population to be served in 1989. This study will attempt to outline <br />where early development will occur and provide a breakdown of <br />residential and commercial/industrial development. <br />B. Data Accumulation and Analysis Phase <br />1. Visit each was=ewater treatment plant in the study area which <br />exceeds 100,000 gallons per day capacity. Assess the condition <br />of the facili.y, expandability, land available and cost to <br />operate and maintain.- Particular attention will be given the <br />Gifford Wastewater Treatment Plant during this portion of the <br />study. <br />Page 1 of 6 <br />1142m/116P/040584 <br />91 BOOK 57 PAGE 254 <br />MAY 2 3 1984 <br />