My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
6/13/1984
CBCC
>
Meetings
>
1980's
>
1984
>
6/13/1984
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/23/2015 11:50:24 AM
Creation date
6/11/2015 4:27:07 PM
Metadata
Fields
Template:
Meetings
Meeting Type
Regular Meeting
Document Type
Minutes
Meeting Date
06/13/1984
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
70
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
IXORA/TREASURE COAST SEWER PROJECT AWARD OF CONTRACT <br />The Board reviewed the following memo dated 6/12/84: <br />TO: THE HONORABLE MEMBERS OF DATE: June 12, 1984 FILE: <br />THE BOARD OF COUNTY COMMISSIONERS <br />THROUGH: Michael Wright <br />County Administrator AWARD OF <br />SUBJECT: WASTEWATERCONTRACT <br />SYSTEM IMPROVEMENTS <br />TREASURE COAST & IXORA UTILITIES <br />Akr�. Pinto <br />FROM. Utility Services Director EFERENCES: <br />DESCRIPTION AND CONDITIONS: <br />A) CONSULTANT REPORT <br />Sverdrup and Parcel have completed a review and evaluation of the <br />bids received May 30, 1984, for the wastewater system improvements <br />for Treasure Coast and Ixora Utilities. Their evaluation and <br />recommendation is attached as Exhibit A. <br />RECOMMENDATION: <br />Staff recommends the Board accept the recommendation of Sverdrup <br />and Parcel which is: <br />1) Award contract for wastewater system improvements to <br />Collee Mechanical, Inc., in the amount of $349,598.50. <br />2) Authorize the Chairman to sign the Notice of Award. <br />Administrator Wright explained that the bids were just <br />opened Monday and could not be included with the <br />Commissioners' agenda packets. <br />Utilities Director Terry Pinto was happy to announce <br />that the bids came in lower than the estimated costs. He <br />recalled that the updated estimate by the engineer was in <br />excess of $400,000 and the bid came in at $349,598.50. <br />Administrator Wright stated that what is technically <br />needed is for the Board to authorize the Chairman to sign <br />the contracts contingent upon prior approval by the Farmers <br />Home Administration. Basically, it is just a technicality; <br />Farmers Home wants to approve the contracts before the <br />22 <br />JUN 13 1984 <br />BOOK 57 FACE 414 <br />
The URL can be used to link to this page
Your browser does not support the video tag.