Laserfiche WebLink
JUN 13 1984 <br />BooK 57 EA,E 421 <br />600,000 gallons. The only limit on that line now is <br />capacity at the plant, not on the line. After the storage <br />tank is built, we can probably produce 500,00 gallons a day <br />on that line. It is just not practical to have that entire <br />corridor dependent on that one line, especially with the <br />growth of development in that area south of SR -60. <br />THE CHAIRMAN CALLED FOR THE QUESTION. <br />The Motion was voted on and carried <br />unanimously (4-0). <br />BID OPMTMG TABUI0.TION <br />INDIAN RIPER COIIN'I7 BOARD OF COUNTY conaSSIONERS <br />PROJECT USh-1/CONMOT #3 <br />i POTABLE WATER DISTRI=ON SYSTEM EXPANSION <br />INDIAN RIVER COMM, FLORIDA <br />jM 11, 1984 (2:00 P.M.)_ <br />A <br />29 <br />A <br />ADDENDUM <br />4 - <br />d <br />0 I <br />No Z <br />G <br />V <br />1 <br />ca <br />Mm <br />o <br />c c <br />c^ <br />cep <br />yr <br />c_ <br />> > <br />., a <br />c <br />m <br />+> >. <br />d d <br />o m <br />y '' <br />w <br />TOTAL. AMOUNT DID <br />NAME &ADORESS ., OF BIDDER <br />.+moo <br />o,m <br />.Ju <br />cm <br />o..4 <br />m c. <br />0 0 <br />14 <br />' <br />CC <br />C <br />CC LaO6 <br />Q <br />UN <br />N►+ <br />{a <br />z <br />3 <br />A.O.B. Underground <br />West Palm Beach, Florida <br />MR General Contractors, Inc <br />768 8yp o� <br />.i West Palm Beach, Florida <br />Barile Excavating & Pipeline <br />Company, Inc. <br />oO <br />78 370 <br />Lake Park, Florida <br />,Brown Brothers <br />T710 i '3 <br />;Casselberry, Florida <br />,C.F.W. Construction, Inc. <br />,Winter Park, Florida <br />Ft. Pierce -Contracting Corp. <br />�Ft, Pierce, Florida <br />.,Heavy Construction <br />West Palm Beach, Florida <br />Lanzo Construction Co. <br />G <br />:'Pompano Beach, Florida <br />Owl &Associates, Inc. <br />Vs 22.5 <br />;Vero Beach, Florida <br />A <br />29 <br />A <br />