My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
6/20/1984
CBCC
>
Meetings
>
1980's
>
1984
>
6/20/1984
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/23/2015 11:50:24 AM
Creation date
6/11/2015 4:28:00 PM
Metadata
Fields
Template:
Meetings
Meeting Type
Regular Meeting
Document Type
Minutes
Meeting Date
06/20/1984
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
67
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
BOOK 57 PAGE 473 <br />money, and authorized final payment of $19,691.15 <br />to contractor, James P. Warr; subject to <br />completion of the project and acceptance by the <br />County Engineer. <br />CHANGE11,111bull.)n <br />to <br />ORDER <br />AJA L)0(-UAJ[NI 6,701 <br />L <br />Engineer <br />Engineer <br />CONIRACTOR <br />I11LD <br />()11UR <br />u <br />❑ <br />❑ <br />Fl <br />L7 <br />CHANGL ORJ)EK NUMBER. 8102 -VI -2 <br />PRVIECT: DPW #8102 <br />(name, addres>) Indian River County <br />Tracking Station <br />TO (Contractor): <br />James P. Warr <br />General Contractor <br />P.O. Box 1731 <br />L <br />Vero Beach, Florida 32961-1731 <br />INITIATION DATE: June 15, 1984 <br />ENGINEER PROJECT NO: 8102 <br />CONTRACT FOR: Oune Walkover <br />CONTRACT DATE: May 16, 1984 <br />You are directed to make the following changes in this Contract: <br />1. Extend the Dune Walkover an additional sixteen (16) feet in the landward <br />direction. <br />Cost $ 2,691.15 <br />Not valid until signed by both the Owner and Engineer <br />.signature of the Contractor indicates his agreement herewith, including any adjustment in the Contract Sum or Contract Time. <br />The original (Contract Sum) (Guaranteed Maximum Cost) was ............................ S 17,000.00 <br />Net change by previously authorized Change Orders ................................... S The (Contract Sum) (Guaranteed Maximum Cost) prior to this Change Order was .......... S <br />The (Contract Sum) (Guaranteed Maximum Cost) will be (increased) (decreased) (unchanged') S 2691.15 <br />by this Change Order .............................................. <br />The new (Contract Sum) (Guaranteed Maximum Cost) including this Change Order .will be ... 3 19,691 .15 ( 0 )Days. <br />The Contract Time will be (increased) (decreased) (unchanged) by <br />The Date of Substantial Completion as of the date of this Change Order therefore is <br />Authorized: <br />Vibert Griffith, Jr., P.E. James P. Warr Indian River cntTniv <br />h Street 1(,�T`�:` TOR 1731 IM'25th Street <br />Address Addr"% Addie» <br />r ~ Vero Beach, Florida 32960 Vero Beach, Florida 32961-1731 Vero B <br />uATt GLLS�— I�AII (020 � <br />-- <br />AIA DOCUMENT G'O1 (tiA,*,(A t,Kt)1K ' �''^'� 1''74 IU''I()t' . AI -,^ " G701-1478 <br />TME AMERICAN INSIITUIt Ut AKLMUL15, 173 Ntw �iit�. ♦\t . N N 01 <br />12 <br />� � r <br />
The URL can be used to link to this page
Your browser does not support the video tag.