Laserfiche WebLink
33rd Street Watermain Construction Cost <br />From Station : 373+00 to 404+40 <br />QUANITY <br />DESCRIPTION <br />UNIT OF <br />MEASUREM <br />ENT <br />UNIT COST <br />TOTAL COST <br />3,100 <br />12" PVC WATER MAIN (F&I) <br />EA <br />50.00 <br />$155,000.00 <br />4 <br />TEMPORARY BACTERIALOGICAL SAMPLING POINT <br />EA <br />565.00 <br />$2,260.00 <br />4 <br />6" GATE VALVE WITH VALVE BOX AND COVER (F&I) <br />EA <br />1,000.00 <br />$4,000.00 <br />4 <br />12" GATE VALVE WITH VALVE BOX AND COVER (F&I) <br />EA <br />2,300.00 <br />$9,200.00 <br />1 <br />2" BLOW OFF ASSEMBLY (F&I) <br />EA <br />1,100.00 <br />$1,100.00 <br />4 <br />FIRE HYDRANT ASSEMBLY <br />LF <br />3,000.00 <br />$12,000.00 <br />1,668 <br />LAWN/ROW RESTORATION (TOP SOIL & MATCH <br />EXIST. SOD) <br />3.00 <br />$5,004.00 <br />1 <br />Sub -Lateral A Canal Crossing <br />LS <br />$18,768.69 <br />$18,768.69 <br />Total Construction Cost Estimate <br />$207,332.69 <br />F:\Utilities\UTILITY - Engineering\Projects - Utility Construction Permits\IRC - 66th Avenue from South of SR 60 to 57th St <br />(FY 2011) UCP 4098\33rd Street\33rdStreetWaterMainProjectParcelCostSheet_08_26_2014.xlsx <br />9/1/2015 <br />ATTACHMENT N0.1316 <br />