My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
11/21/1984
CBCC
>
Meetings
>
1980's
>
1984
>
11/21/1984
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/23/2015 11:50:26 AM
Creation date
6/4/2015 1:16:35 PM
Metadata
Fields
Template:
Meetings
Meeting Type
Regular Meeting
Document Type
Minutes
Meeting Date
11/21/1984
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
76
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ON MOTION by Commissioner Wodtke, SECONDED <br />by Commissioner Bird, the Board unanimously <br />(4-0) authorized the Utility staff to advertise <br />for bids and negotiate a continuing contract <br />for provision of consulting services in the <br />operation and maintenance of the County's Reverse <br />Osmosis Water Treatment Plant. <br />AUTHORIZE ADVERTISING FOR BIDS FOR ENGINEERING FIRM TO DESIGN <br />SUBREGIONAL WASTEWATER FACILITY, SR 60 CORRIDOR <br />The Board reviewed staff memo, as follows: <br />TO: The Honorable Members of DATE: November 13, 1984 FILE: <br />The Board of County Commissioners <br />THRU: Michael Wright SUBJECT: SUBREGIONAL WASTEWATER FACILITY <br />County Administrator STATE ROAD 60 CORRIDOR <br />Terrance G. Pinto <br />Utility Services Dir/c t <br />FROM: Ronald R. Brooks REFERENCES: <br />Environmental Engineering <br />Specialist/Utility Services <br />DESCRIPTION AND CONDITIONS: <br />There is substantial interest and financial support .for construction <br />of a subregional wastewater treatment facility serving the State <br />Road 60 corridor and surrounding area. We are now at the stage <br />I where the facility needs to be designed and all required construction <br />permits obtained. <br />ANALYSIS: <br />The Board of County Commissioners must approve any expenditure of <br />funds for the design of the proposed wastewater facility. Since <br />the proposed subregional facility appears to be a feasible endeavor, <br />the County needs to actively proceed towards construction of the <br />facility to accomodate the rapid growth along the State Road 60 <br />corridor. <br />RECOMMENDATION: <br />Staff recommends that the Board of County Commissioners authorize <br />the Division of Utility Services to advertise for bids and obtain <br />the services of an engineering firm to design a subregional wastewater <br />treatment facility for the State Road 60 corridor and obtain all <br />required construction permits. <br />75 <br />N O V 21 1984 <br />
The URL can be used to link to this page
Your browser does not support the video tag.