My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
09/22/2015 (2)
CBCC
>
Meetings
>
2010's
>
2015
>
09/22/2015 (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/24/2015 11:08:36 AM
Creation date
11/24/2015 11:08:01 AM
Metadata
Fields
Template:
Meetings
Meeting Type
BCC Regular Meeting
Document Type
Agenda Packet
Meeting Date
09/22/2015
Meeting Body
Board of County Commissioners
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
335
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
{ <br /> i <br /> no additional right-of-way is needed for the future expansion of the CR 510.The segment of U.S.#1 <br /> adjacent to the subject property is a 4 lane paved road with 120 feet of road right of way. For that <br /> segment of U.S. #1, there is a need for 40 feet of additional right of way. To the south, the subject <br /> property abuts 82nd Street, an unpaved local road. A portion of the property's west boundary abuts <br /> 4601 Avenue which is also an unpaved local road. <br /> ANALYSIS <br /> In this section, an analysis of the reasonableness of the application will be presented. This section <br /> will include the following: <br /> • An analysis of the proposed rezoning's impact on public facilities; <br /> • An analysis of the proposed rezoning's compatibility with surrounding areas; <br /> • An analysis of the proposed rezoning's consistency with the comprehensive plan; and <br /> • An analysis of the proposed rezoning's potential impact on environmental quality. <br /> Concurrency of Public Facilities <br /> The site comprising this request is located within the County's Urban Service Area,an area deemed <br /> suited for urban scale development. The comprehensive plan establishes standards for: <br /> Transportation,Potable Water,Wastewater,Solid Waste,Stormwater Management,Public Schools, <br /> and Recreation(Future Land Use Policy 3.1). Adequate provision of these services is necessary to <br /> ensure the continued quality of life enjoyed by the community. To ensure that the minimum <br /> acceptable standards for these services and facilities are maintained,the comprehensive plan requires <br /> that new development be reviewed for a concurrency determination. For rezoning requests, this <br /> review is undertaken as part of the conditional concurrency determination application process. <br /> As per section 910.07 of the County's Land Development Regulations (LDRs), conditional <br /> concurrency review examines the available capacity of each facility with respect to a proposed <br /> project. Since rezoning requests are not projects,county regulations call for the concurrency review <br /> to be based upon the most intense use of the subject property based upon the requested land use <br /> designation. <br /> As per section 910.07(2)of the Concurrency Management Chapter of the County's LDRs,projects <br /> which do not increase density or intensity of use are exempt from concurrency requirements.In this <br /> case, the requested rezoning will change the subject property's zoning from one commercial <br /> retail/office zoning district to another similar type of commercial zoning district. Therefore,the most <br /> intense use for the subject property will not change due to the requested rezoning.Consequently,the <br /> proposed rezoning will not increase the density or intensity of the uses allowed on the subject site <br /> and will not have any additional public facility impacts. Thus,this rezoning request is exempt from <br /> concurrency review because the requested rezoning will not increase the density or intensity of uses <br /> on the subject site. <br /> As with all projects, a detailed concurrency analysis will be done in conjunction with site <br /> development. That concurrency analysis will address facility service levels and demand. An initial- <br /> 3 concurrency certificate for 500 multi-family units has been issued for the overall development site, <br /> of which the subject property is a part. That concurrency certificate expires on August 8, 2017. <br /> 6 149 <br /> i <br />
The URL can be used to link to this page
Your browser does not support the video tag.