Laserfiche WebLink
i <br /> 1701 Highway AIA,Suite 301 <br /> Vero Beach,Florida 32963 <br /> tel:772 231-4301 <br /> September 28,2015 <br /> Mr. Vincent Burke, P.E. <br /> Director of Utility Services <br /> Indian River County <br /> 180127th Street, Building A <br /> Vero Beach, Florida 32960 <br /> Subject: Work Order No. 12—Amendment No. 1 <br /> South County Water Treatment Plant Well No. 7 <br /> Final Design, Permitting and Bidding Services <br /> Dear Mr. Burke: <br /> On July 1, 2014,the Indian River County(County) Board of County Commissioners(BOCC) authorized the <br /> subject Work Order for CDM Smith to complete the design of a new production well at the South County <br /> Water Treatment Plant to provide for operational flexibility of the wellfield.Since originally beginning <br /> this project(under separate cover) in 2009,the County has now shifted from the Central District to the <br /> Southeast District of the Florida Department of Environmental Protection (FDEP).As such, FDEP is now <br /> requesting that the well location be shifted to allow easier access for compliance inspections.This <br /> request from FDEP came after CDM Smith completed the 100 percent bid documents for the project. <br /> Therefore, additional services are required to complete the relocation, redesign the electrical feed to <br /> the well and complete the permitting services associated with the changes.Transmitted herewith are 3 <br /> copies of Amendment No. 1 to Work Order No. 12 to complete these additional activities. <br /> Sincerely, <br /> Jill T. Grimaldi, BCES <br /> Principal Scientist <br /> CDM Smith Inc. <br /> File: 105001.02.01 <br /> cc: Arjuna Weragoda, County <br /> Eric Grotke, CDM Smith <br /> 0RL0191-Ltr-29Sep2015 ga 166 <br />