My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
10/06/2015 (2)
CBCC
>
Meetings
>
2010's
>
2015
>
10/06/2015 (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/17/2018 4:09:09 PM
Creation date
11/24/2015 11:20:45 AM
Metadata
Fields
Template:
Meetings
Meeting Type
BCC Regular Meeting
Document Type
Agenda Packet
Meeting Date
10/06/2015
Meeting Body
Board of County Commissioners
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
232
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
EXHIBIT A <br /> SCOPE OF WORK <br /> INDIAN RIVER COUNTY <br /> SOUTH COUNTY WATER TREATMENT PLANT <br /> FINAL DESIGN, PERMITTING AND BIDDING SERVICES <br /> FOR PROPOSED WELL NO. 7 <br /> AMENDMENT NO. 1 <br /> This Authorization, when executed,shall be incorporated in and become part of the Contract for <br /> Consulting/Professional Services between the Indian River County(County), and CDM Smith Inc. <br /> (Consultant), dated December 6, 2011 hereafter referred to as the Contract. F <br /> BACKGROUND <br /> I <br /> The County owns and operates the South County Water Treatment Plant (WTP)which currently <br /> operates with six existing Upper Floridan Aquifer(UFA) production wells.The existing Consumptive Use <br /> Permit (CUP)for the South County WTP also includes a future permitted seventh well that has not yet <br /> been constructed. In August 2009,the Board of County Commissioners approved a Work Order for the <br /> Consultant to design, permit and provide services during construction of the proposed well and raw <br /> water pipeline.After reaching the 100 percent design level (minus the County's front-end documents), <br /> staff decided to put the project on hold and not construct the well.The County now wishes to finalize <br /> design,complete the bid package and finalize permitting of the proposed well at the South County WTP. <br /> In July 2014,the County authorized Work Order No. 12 for the Consultant to complete the design and <br /> permitting activities that begun in 2009, as well as to provide bidding services for the new well.Since <br /> the 2009 efforts, the County has shifted from the Central District FDEP to the Southeast District of FDEP. <br /> This change resulted in a change in permitting staff and the previously proposed well location became a <br /> topic of concern for the Southeast District staff. FDEP requested that the well be relocated out of the dry <br /> stormwater treatment area and onto higher ground to allow for ease of access during compliance <br /> inspections during or after storm events.This change requires that the 100 percent design plans for both <br /> the well/wellhead and the pipeline be updated to reflect the new location, as well as to provide a <br /> modified electrical design. <br /> The following is the scope of services to be provided under this authorization is amended as follows. <br /> SCOPE OF SERVICES <br /> Consultant will perform the following task services: <br /> Task 1.0 COORDINATION WITH FWS <br /> No changes. <br /> TASK 2.0 MEETING WITH SJRWMD <br /> No changes. <br /> TASK 3.0 PREPARATION OF FINAL BID PACKAGE <br /> Subtask 3.1 Final Contract Documents <br /> CDM Smith will update the Wellhead and Pipeline plans to reflect the revised location of the well. Final <br /> plans will also include modifications to the electrical design to accommodate power being provided from <br /> A-1 Amendment No 1.doc 167 <br />
The URL can be used to link to this page
Your browser does not support the video tag.