Laserfiche WebLink
i <br /> I <br /> ver .nh -0"'-0"' <br /> n t ter <br /> LABOR COST ESTIMATE FROM CONTRACTOR'S BID ITEM LIST <br /> BLUE GOOSE.CONSTRUCTION <br /> Pm)rct VISTA ROVAL 7"GALVANIZED WATER MAIN REPLACEMENT <br /> Date•. February 11,2015 <br /> ME,0,114 BIISII LABOR COST <br /> Did Bld Item Estimated Unit of Labor Unit Tata)Lobos <br /> Item Na. Deseri tin. •art Meos." Price Price <br /> 71 Al billotlnn.Demeblllrad.m MOT 1.0 I_-% -_-0.10 15,201.75 <br /> 07a I Install 2"HDPE Blne Stripe DI"mlon.l Ddll(DRI II InNorling f.slan of 300.0 LF SJJ15 510.00.5.00 <br /> oloe and Btdnn Water Service <br /> Olb _Iam"4"Biae PVC Water MAI. 110.0 LF Will 5440.00 <br /> __07. 1osn0 4"HDPE Bl.,Stripe Directional Drill(DRI 1)1nriadl.g farina M 840.0 LF &1J 15 528.014.00 <br /> orae and fitn.es <br /> Install M"hanlcal Resimined Joint DI Fltilnm 0.5 TON $4,100.00 S2.IK0.00 <br /> _ 16. Install 3-Wet Tart./role vnlve 2.0 EA 5900.00 $1,800.00 <br /> 19n Install 4"CVAB `-_-- 2.0 EA. 585.00 5170.00 <br /> 23 Test Noin/Pinholes I 22.0EA. 5230.00 &5.500.00 <br /> mos <br /> 29. Fill.press."lest.ehlodne and flush water main 1,220.0 LF 5110 S1,8J0.00 <br /> 70c Take Bamerial S.mpleli7ellver 1.I.ob u I 10.0 I EA 5150.00_ SI100.00 <br /> (.5 _SS.c.L Rem-e and Dlsome.f AMhnit Pavement 1.0 TON 523.001 525.00 <br /> 66. Install Amholt Cement Twe Sd Over C.ropaeted Rose 1.0 TON &12.00 &12.00 <br /> _ 67b Remma Dbome (and Rmlaee Rock Base Came 1.0 TON SIJ.00 513.00 <br /> 67e Re.rovu Dlmme of and Replace StablBred S.berude 1.0 TON 113.00 SI3.00 <br /> 116. Lawn Restoration(Topsail and Sod) 278 !� SV 52.25 562510 <br /> Subtotal Subte.nl Water Svrtem L.bor and M.t,rtnh _ T &52,01710 <br /> 70 Record D-A.Cs per IRCDUS Standards -� I -1_ 1.5 &1.000.00 <br /> Snblolnl S.btmnl Water S)vtem Lab-,Mab.Demnh"MOT.Materials, A 560,219,25 <br /> Pertaining <br /> Fo"e IRC DUS Contingency Aee9.nt I EA 5(.021.97 <br /> Fare, <br /> TOTAL LABOR S71,442.9.1 <br /> I <br /> 1..t <br />