Laserfiche WebLink
Commissioner Scurlock noted that there would be an addi- <br />tional $7,100 that we will have to borrow somewhere, and if there <br />is added financing, there will be added cost. <br />Attorney Brandenburg stated that the added cost will not <br />change by virtue of this change order because we have the 2.7 <br />million issue to pay off, and that is it. <br />ON MOTION by Commissioner Scurlock, SECONDED <br />by Commissioner Bowman, the Board unanimously <br />approved Change Order #1, Project U84-1, Sippel, <br />Masteller, Lorenz & Hoover (Engineering) in the <br />amount of $7,150. <br />UNITED STATES DEPARTMENT OF AGRICULTURE FORM APPROVED OMB No. 05754"2 <br />torrn FmHA 424-7 FARMERS HOME ADMINISTRATIONORDER NO. <br />�. <br />(Rev. 6-11-80) .� <br />CONTRACT CHANGE ORDER DATE <br />November 15, 19811 <br />. <br />STATE <br />Florida <br />CONTRACT FOR COUNTY <br />Indian River County Water Project U84-1 Indian River <br />OWNER <br />Indian River County <br />To ..-.Si��elt Mastellerr Lorenz & Hoover; Inc. _ -- <br />_.. .... .._. _.._..-•---..-.__.._____---.__ ..--------------- <br />(Contractor) <br />You are hereby requested to comply with the following changes from the contract plans and specifications: <br />Description of Changes DECREASE INCREASE <br />(Supplemental Plans and Specifications Attached) in Contract Price in Contract Price <br />SECTION B — COMPENSATION FOR ENGINEERING SERVIC S <br />Additional Engineering Design: Two (2) Proposed Altitude Valves/Chambers at: <br />A. Existing 500,000 gallon elevated water storage tank at water treatment plant <br />B. Existing 150,000 gallon elevated water storage tank near Velde Ford <br />(U.S. Highway #1) <br />Perfoxm the necessary site field work to locate all above ground physical <br />features required for our design; research and locate as much underground ac- <br />tive piping, conduits, etc., as possible within the design area; size and select <br />the altitude valve to be used based on your flow and pressure requirements; <br />design, engineer and prepare contract plans for the alteration of the tank pip- <br />ing so the new altitude valve controls all tank inflow and outflow, necessary <br />new piping, valves, fittings, altitude valve and chamber; -prepare and submit <br />necessary permit to Florida D.E.R. <br />Lump Sum Fee Increase for Section B +$ 5950.00 <br />87 <br />JAN 2 1985 BOOK 59��� <br />